12509 Windfall Cir
Dallas, TX 75253
12509 Windfall Cir: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 12509 Windfall Cir, Dallas, TX 75253. The most recent, filed December 31, 2020, covers: “Addition to sfd”.
Compiled from City of Dallas records · updated Dec 31, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Dec 31, 2020
- since Dec 31, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 12509 Windfall Cir
What is being built at 12509 Windfall Cir?
The latest filing (City of Dallas permit 2010281029, December 31, 2020) covers addition to sfd.
How many permits and filings does 12509 Windfall Cir have?
2 filings across 2 projects, from December 31, 2020 to December 31, 2020.
Is there other construction near 12509 Windfall Cir?
Yes. Nearby filings include 12524 Windfall Cir (connection to city water meter, Oct 14, 2026); 12521 Windfall Cir (installation of a new 8.2 kw dc rooftop photovoltaic solar system consisting of 20 aptos dna-108-mf10-410w modules, 10 duracell power center d600-m2a microinverters, 8 duracell dura 5 batteries, one duracell max hybrid 15 inverter, associated disconnects, load center, gateway, wiring, racking, and related electrical equipment. the system will be interconnected with the existing electrical service, Oct 12, 2026); 12511 Kleberg Rd (replace 2.5 ton complete gas system, May 15, 2025).
How do I get alerts for new permits at 12509 Windfall Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75253- 12524 Windfall CirOct 14, 2026Connection to city water meter · 52 m away
- 12521 Windfall CirOct 12, 2026Installation of a new 8.2 kw dc rooftop photovoltaic solar system consisting of 20 aptos dna-108-mf10-410w modules, 10 duracell power center d600-m2a microinverters, 8 duracell dura 5 batteries, one duracell max hybrid 15 inverter, associated disconnects, load center, gateway, wiring, racking, and related electrical equipment. the system will be interconnected with the existing electrical service · 82 m away
- 12511 Kleberg RdMay 15, 2025Replace 2.5 ton complete gas system · 144 m away
- 12535 Kleberg RdMar 4, 2026Install 6' cedar on steel posts 24" deep and on 8' centers. walk gate on the left side of the house. install 8' cedar on steel posts 24" deep on 6' centers. 12' manual slide gate on the denmark st. fence line. there will be a walk gate on the right side of the house. install 4' galvanized chain link in the front of the house, with an 11' manual slide gate over the driveway · 160 m away
- 12941 Windfall CirDec 1, 2025Gas test · 197 m away
- 2317 Jordan Valley RdApr 7, 2026New construction single family hvac system, duscts, equipment · 206 m away
- 12929 Windfall CirMar 25, 2026Finish out single family home · 214 m away
- 12908 Windfall CirOct 28, 2025Installation of new hvac system · 257 m away
- 12904 Windfall CirApr 20, 2026Replace electrica, panel and service drop · 263 m away
- 12837 Windfall CirSep 8, 2026Atmos turned gas off. repair leak on 3/4 black iron fittings. tested system holding pressure · 299 m away
- 2234 Jordan Valley RdNov 2, 2026Plumbing associated with permit #res-new-26-001772 · 317 m away
- 2217 Jordan Valley RdJan 22, 2021Construct new sfd · 340 m away