3303 Middlefield Rd
Dallas, TX 75253
3303 Middlefield Rd: 1 project on record
City of Dallas lists 1 filing across 1 project at 3303 Middlefield Rd, Dallas, TX 75253. The most recent, filed July 16, 2025, covers: “Work on shed”.
Compiled from City of Dallas records · updated Jul 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 16, 2025
- since Jul 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3303 Middlefield Rd
What is being built at 3303 Middlefield Rd?
The latest filing (City of Dallas permit RES-ELC-25-001360, July 16, 2025) covers work on shed.
How many permits and filings does 3303 Middlefield Rd have?
1 filing across 1 project, from July 16, 2025 to July 16, 2025.
Is there other construction near 3303 Middlefield Rd?
Yes. Nearby filings include 3225 Purple Ash St (install hvac complete system with ductwork, Jun 13, 2025); 3219 Purple Ash St (install hvac complete system with ductwork, Jun 13, 2025); 3213 Purple Ash St (install hvac complete system with ductwork, Jul 3, 2025).
How do I get alerts for new permits at 3303 Middlefield Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75253- 3225 Purple Ash StJun 13, 2025Install hvac complete system with ductwork · 290 m away
- 3219 Purple Ash StJun 13, 2025Install hvac complete system with ductwork · 290 m away
- 3213 Purple Ash StJul 3, 2025Install hvac complete system with ductwork · 291 m away
- 3513 Silver Maple LnMar 5, 2026Nsfaa-construction of two freestanding prefabricated pergola structures in the rear yard of an existing single-family residence. each pergola measures approximately 8.9 feet by 14 feet and will be installed adjacent to one another.work includes extension of the existing concrete patio to create a reinforced slab foundation for the pergola installations. the new concrete slab will be properly formed, reinforced, poured, and finished to support the pergola structures.following slab installation, both pergolas will be professionally assembled and securely anchored to the concrete base in accordance with manufacturer specifications. electrical outlets and plumbing for an outdoor sink will be installed as part of the project under the appropriate trade permits.all work will be performed in compliance with applicable residential building codes and local regulation · 343 m away
- 3510 Middlefield RdApr 26, 2026Install an 8' fence · 364 m away
- 3518 Middlefield RdOct 21, 2026Hvac complete system with ductwork · 377 m away
- 3517 Sourwood LnJun 13, 2025Electrical for new construction · 434 m away
- 3093 Middlefield RdAug 26, 2026Removing existing 2 hvac systems and ductwork due to systems no longer being large enough to withstand new dimensions of new addition and remodel · 449 m away
- 3563 Chestnut Oak DrJul 3, 2025Install roof mounted pv solar system and energy storage system · 450 m away
- 3529 Sourwood LnJan 21, 2025New single family residential build · 463 m away
- 3541 Sourwood LnJun 13, 2025Electrical for new construction · 495 m away
- 3567 Silver Maple LnJun 16, 2026Installing a 50 amp tesla charger · 553 m away