6910 Midcrest Dr
Dallas, TX 75254
6910 Midcrest Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 6910 Midcrest Dr, Dallas, TX 75254. The most recent, filed September 17, 2020, covers: “Interior & exterior remodel”.
Compiled from City of Dallas records · updated Sep 17, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Sep 17, 2020
- since Sep 17, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 6910 Midcrest Dr
What is being built at 6910 Midcrest Dr?
The latest filing (City of Dallas permit 2009111022, September 17, 2020) covers interior & exterior remodel.
How many permits and filings does 6910 Midcrest Dr have?
2 filings across 2 projects, from September 17, 2020 to September 17, 2020.
Is there other construction near 6910 Midcrest Dr?
Yes. Nearby filings include 6930 Midcrest Dr (install osb sheathing, install stone coated metal roof. replace 1x6 fascia boards, repair soffit and install 6 inch gutters, Sep 2, 2026); 6931 Midcrest Dr (50 gallon gas w.h. in pull down attic inside hallway, Jun 23, 2025); 6941 Midcrest Dr (electrical rewire ew electrical service 200a, Mar 26, 2026).
How do I get alerts for new permits at 6910 Midcrest Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75254- 6930 Midcrest DrSep 2, 2026Install osb sheathing, install stone coated metal roof. replace 1x6 fascia boards, repair soffit and install 6 inch gutters · 35 m away
- 6931 Midcrest DrJun 23, 202550 gallon gas w.h. in pull down attic inside hallway · 38 m away
- 6941 Midcrest DrMar 26, 2026Electrical rewire ew electrical service 200a · 55 m away
- 6931 Gateridge DrOct 10, 2025Replace 213 lf of triple beam, sister 65 lf of joist, 56 lf of sill plate, 56 lf of 2x6 sole plate · 106 m away
- 6911 Gateridge DrMay 4, 2026Full under slab sewer pipe replacementexcavation to, re-route / replace (front left bathroom,back left bathroom, half bathroom, front right bathroom, backright bathroom, bar sink, kitchen & washer line under home sewerpipes only) of the plumbing sewer drainpipe under the home only.our plan reroutes the under-slab/home sewer pipe and connects itback into the yard sewer line at the city tap area , effectivelyreplacing the yard sewer line as well · 107 m away
- 6910 Gateridge DrDec 9, 2020Replace or modify existing hvac · 119 m away
- 6930 Gateridge DrAug 14, 2025Water heater replacement in garage · 119 m away
- 6940 Gateridge DrOct 19, 2026Replace 50 gal gas wh · 123 m away
- 6858 Midcrest DrAug 4, 2026Replacing main electric panel and overhead service · 124 m away
- 6950 Mossvine DrOct 23, 2026Install 20' of 8' tall cedar fence, one electric drive gate · 126 m away
- 6878 Mossvine CirFeb 6, 2026Excavate and repair one leak on the cold domestic water service line · 142 m away
- 6848 Midcrest DrOct 30, 2026Broken gas line · 145 m away