groundranger
Recent · latest filing Jan 2026Residential

7424 Spring Valley Rd

Dallas, TX 75254

Sewer pipe replacement permitted at 7424 Spring Valley Rd

A full sewer-pipe replacement and reroute beneath the home was permitted on January 13, 2026. The City of Dallas permit describes work on the home’s sewer pipes and a connection back to the yard sewer line near the city tap.

Summarized from City of Dallas records · updated Jan 13, 2026

Projects
1
1 filings
Latest filing
Jan 13, 2026
since Jan 13, 2026
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Full under pier & beam sewer pipe replacementexcavation to, re-route / replace see diagram (left side frontbathroom, left side back bathroom, right side bathroom, a/ccondensation drain line connection under the house, kitchen &washer line under home sewer pipes only) of the plumbing sewerdrainpipe under the home only. our plan reroutes the under-slab/home sewer pipe and connects it back into the yard sewer line at thecity tap area , effectively replacing the yard sewer line as well

    Full under pier & beam sewer pipe replacementexcavation to, re-route / replace see diagram (left side frontbathroom, left side back bathroom, right side bathroom, a/ccondensation drain line connection under the house, kitchen &washer line under home sewer pipes only) of the plumbing sewerdrainpipe under the home only. our plan reroutes the under-slab/home sewer pipe and connects it back into the yard sewer line at thecity tap area , effectively replacing the yard sewer line as well

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-26-000453
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 7424 Spring Valley Rd

What work is permitted at 7424 Spring Valley Rd?

A City of Dallas residential plumbing permit covers rerouting and replacing sewer pipes beneath the home, with a connection back to the yard sewer line near the city tap. The permit is RES-PLM-26-000453, dated January 13, 2026.

Is a new home being built at 7424 Spring Valley Rd?

The January 13, 2026 permit is for sewer-pipe replacement beneath an existing home, not new home construction.

Is a restaurant opening at 7424 Spring Valley Rd?

The permit record describes residential plumbing work on sewer pipes beneath a home. It does not indicate that a restaurant is opening.

What is permit RES-PLM-26-000453 for in Dallas?

It is a City of Dallas residential plumbing permit for sewer-pipe rerouting and replacement at 7424 Spring Valley Rd. The filing date is January 13, 2026.

Does the sewer work at 7424 Spring Valley Rd include the yard line?

The permit description says the rerouted home sewer pipe will connect back to the yard sewer line near the city tap, effectively replacing the yard sewer line as well.

Also being built nearby

All of 75254

More restaurants in 75254.

Get alerts for 7424 Spring Valley Rd