groundranger
Recent · latest filing May 2026Commercial

18190 Dallas Pkwy

Dallas, TX 75287

Electrical repairs and two HVAC replacements at 18190 Dallas Pkwy

Permits indicate electrical meter-base work and replacement of two HVAC systems at 18190 Dallas Pkwy. The City of Dallas issued permits for the HVAC work on April 15, 2026, an emergency meter-base repair on April 29, and additional meter-base work on May 27.

Summarized from City of Dallas records · updated May 27, 2026

Projects
3
3 filings
Latest filing
May 27, 2026
since Apr 15, 2026
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. At oncor's demand... replace the new meter base with a transocket due to oncor line crossing wells fargo load wires

    At oncor's demand... replace the new meter base with a transocket due to oncor line crossing wells fargo load wires

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-002202
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Emergency repair of damaged electrical meter base after auto accident

    Emergency repair of damaged electrical meter base after auto accident

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-001900
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Remove two existing 5 ton split systems, install two new trane split systems. hvac

    Remove two existing 5 ton split systems, install two new trane split systems. hvac

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-000875
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 18190 Dallas Pkwy

What work is happening at 18190 Dallas Pkwy?

City of Dallas permits cover replacement of two 5-ton split HVAC systems and two electrical meter-base jobs, including an emergency repair after an auto accident.

Is a new building being built at 18190 Dallas Pkwy?

The records provided describe HVAC replacement and electrical work, not construction of a new building.

When were permits issued for work at 18190 Dallas Pkwy?

The three permits were filed April 15, April 29, and May 27, 2026.

What HVAC work is planned at 18190 Dallas Pkwy?

Permit COM-MEC-26-000875, filed April 15, 2026, covers removing two existing 5-ton split systems and installing two new Trane split systems.

What electrical work is permitted at 18190 Dallas Pkwy?

Permit COM-ELC-26-001900 covers emergency repair of a damaged electrical meter base after an auto accident. Permit COM-ELC-26-002202 covers meter-base work requested by Oncor.

What is being worked on near Murphy #8008 on Dallas Parkway?

At 18190 Dallas Pkwy, City of Dallas permits indicate two HVAC system replacements and electrical meter-base work. The HVAC permit was filed April 15, 2026, and the latest electrical permit was filed May 27.

Also being built nearby

All of 75287
Get alerts for 18190 Dallas Pkwy