Residential plumbing work at 2412 Kingsridge Dr
City of Dallas permits show residential plumbing work at 2412 Kingsridge Dr, including a water supply line repair, a backflow device installation and a double cleanout installation. The permits were filed between January 22 and May 4, 2026.
Summarized from City of Dallas records · updated May 4, 2026
- Projects
- 3
- 3 filings
- Latest filing
- May 4, 2026
- since Jan 22, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 2412 Kingsridge Dr
What is being built at 2412 Kingsridge Dr?
The City of Dallas records show residential plumbing work, not a new building. Permits cover a water supply line repair, a backflow device installation and a double cleanout installation.
What plumbing work is planned at 2412 Kingsridge Dr?
The permits describe a repair to the main water supply line in the front yard, a backflow device installation and a double cleanout installation.
When were permits filed for 2412 Kingsridge Dr?
The three City of Dallas permit filings were dated January 22, February 20 and May 4, 2026.
What is the latest permit for 2412 Kingsridge Dr?
The latest listed filing is permit RES-PLM-26-004631, dated May 4, 2026, for a double cleanout installation.
Was a water line repair permitted at 2412 Kingsridge Dr?
Yes. Permit RES-PLM-26-000922, filed January 22, 2026, describes a repair to the main water supply line in the front yard.
Was a backflow device installation permitted at 2412 Kingsridge Dr?
Yes. City of Dallas permit RES-PLM-26-001960, dated February 20, 2026, lists a backflow device installation.
Also being built nearby
All of 75287- 2415 Kingsridge DrMay 20, 2025Remove old roof to the decking. replace any rotten wood if needed. install ice and water shield on all valleys. place synthetic underlayment. replace all vents and plumbing boots. re-flash chimney(s) if needed. install new class 3 shingles. install wind turbines. caulk and seal pipes, vents, and chimney flashing. haul off all waste and debris. clean all areas well with a roller magnet · 13 m away
- 2407 Harbinger LnOct 8, 2026Yard line replacement with valves up to 30 feet and double check · 79 m away
- 2403 Silverthorne DrOct 2, 2026Replace electrical panel · 118 m away
- 2328 Silverthorne DrSep 8, 2026Mcr with battery residential add on of battery to the residents existing roof mounted solar system · 119 m away
- 2304 Kingsridge DrFeb 19, 2026Install 50 gallon gas water heater in garage closet (swap out) · 128 m away
- 2512 Kingsridge DrApr 29, 2026Replace hvac system with 3 ton heat pump deluxe 15 seer; no duct work · 134 m away
- 2423 Silverthorne DrMar 18, 2026Reroute water line overhead to bypass line leaking below slab · 140 m away
- 2323 Harbinger LnJun 10, 2026Installation of a grid tied, roof mounted, solar pv systems with a installation of a battery back up system and 3rd party reviewed plans · 142 m away
- 2523 Kingsridge DrJun 3, 2025Replacing 50 gallon gas water heater in garage · 147 m away
- 2324 Harbinger LnAug 11, 2025Repair gas leak · 148 m away
- 2320 Harbinger LnJun 8, 2026Hvac replacement 4 ton gas horizontal sl25 lennox · 152 m away
- 17703 Farley TrlMay 11, 2026Class 3 roof installationthe project involves a complete roof class 3 impact-resistant system. the scope includes:tear-off & inspection: removal of all existing roofing materials down to the wood deck. underlayment: installation of a high-performance synthetic underlayment across the entire deck, with self-adhering ice and water shields applied at all eaves, valleys, and penetrations.shingle application: installation of class 3 impact-resistant asphalt shingles using a high-wind, six-nail fastening pattern.flashing & ventilation: replacement of all pipe boots and chimney flashing. a ridge vent system will be installed to ensure balanced attic ventilation and thermal control.finalization: detailed cleanup and magnetic sweep of the site to ensure the removal of all debris · 156 m away