2714 Stevens Point Ln
Dallas, TX 75287
2714 Stevens Point Ln: 1 project on record
City of Dallas lists 1 filing across 1 project at 2714 Stevens Point Ln, Dallas, TX 75287. The most recent, filed September 15, 2025, covers: “Water main line replacement: trick pullwater line must be in a straight line, limitations apply up to 75 feet. if a double check valve is installed it is not covered in given price for testing or replacement. sometimes this will not work and a trench will need to be dug, this would be an extra charge. permit included in this cost”.
Compiled from City of Dallas records · updated Sep 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 15, 2025
- since Sep 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectWater main line replacement: trick pullwater line must be in a straight line, limitations apply up to 75 feet. if a double check valve is installed it is not covered in given price for testing or replacement. sometimes this will not work and a trench will need to be dug, this would be an extra charge. permit included in this cost
Water main line replacement: trick pullwater line must be in a straight line, limitations apply up to 75 feet. if a double check valve is installed it is not covered in given price for testing or replacement. sometimes this will not work and a trench will need to be dug, this would be an extra charge. permit included in this cost
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 2714 Stevens Point Ln
What is being built at 2714 Stevens Point Ln?
The latest filing (City of Dallas permit RES-PLM-25-004901, September 15, 2025) covers water main line replacement: trick pullwater line must be in a straight line, limitations apply up to 75 feet. if a double check valve is installed it is not covered in given price for testing or replacement. sometimes this will not work and a trench will need to be dug, this would be an extra charge. permit included in this cost.
How many permits and filings does 2714 Stevens Point Ln have?
1 filing across 1 project, from September 15, 2025 to September 15, 2025.
Is there other construction near 2714 Stevens Point Ln?
Yes. Nearby filings include 18911 Bilbrook Ln (emergency meter base replacement, Jun 12, 2026); 2718 April Hill Ln (replace 3 ton ah only, May 19, 2025); 19036 Bilbrook Ln (foundation repair, May 15, 2026).
How do I get alerts for new permits at 2714 Stevens Point Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75287- 18911 Bilbrook LnJun 12, 2026Emergency meter base replacement · 86 m away
- 2718 April Hill LnMay 19, 2025Replace 3 ton ah only · 92 m away
- 19036 Bilbrook LnMay 15, 2026Foundation repair · 147 m away
- 18803 Bilbrook LnMay 30, 2025Tear off existing shingles and install 28sq of certainteed landmark · 156 m away
- 2719 Cancun LnSep 9, 2025Foundation repair-install 22 pilings · 187 m away
- 19025 Platte River WaySep 9, 2026Replacing a 200 amp meter base, a 20 amp panel, a 200 amp main disconnect, grounding and surge protection · 218 m away
- 18707 Bilbrook LnJan 27, 2026Install 11 piers · 259 m away
- 18911 Platte River WayJul 17, 2025- remove existing shingles down to clean deck and inspect current decking for rot- re-nail any loose wood as needed.- if bad or rotten wood is discovered, decking will be replaced at a price of $50 per sheet.- if more layers of roof materials are discovered on tear-off, there will be additional fee of $10 per sq.- install new 3’ of malarkey ice and water shield at all valleys and penetrations- install new rhinofelt synthetic underlayment- install new malarkey starter strip shingles along all gutter lines, rake edges, and valleys.- install new malarkey weatherwood in color shingles per specifications using 1 ¼” roofing nails. e- install new malarkey weatherwood ridge cap- remove current ventilation and replace with matching ventilation plus additional vx25- install new pipes and chimney flashings then painted to match shingles.- landscaping will be protected using tarps as best as possible, but due to the cold and volume we cannot guarantee that every plant, bush or treewill survive.- all debris will be cleaned up using tarps, magnet sweeper and brooms then will be hauled away.- shingle warranty and lien waivers supplied upon receipt of final payment.- provide owner with 5 yr workmanship warranty from redbrid roofing · 277 m away
- 18903 Platte River WayDec 1, 202550 gallon electric water heater replacement · 282 m away
- 18731 Platte River WayOct 27, 2026Gas test + repair - locked gas meter · 292 m away
- 18730 Platte River WayOct 19, 2026Installing 13 total pilings (11 exterior, 2 exterior with concrete breakouts) · 305 m away
- 19009 Tupelo LnJun 26, 2026Amana complete system gas 14.3 seer23.0 ton · 307 m away