3900 Frankford Rd, Dallas, TX 75287
Dallas, TX 75287 · New Market - Midway LLC
Mavis Tire shop planned at 3900 Frankford Road
A new 6,952-square-foot retail facility designed for a Mavis Tire shop is planned at 3900 Frankford Road in Dallas. The TDLR project registration was filed June 10, 2026, and lists an applicant-estimated project cost of $1.2 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 10, 2026
- since Jun 10, 2026
- Largest scope
- 6,952 sf
- Estimated cost
- $1.2M
- state registration
Where this project stands
Under constructionMavis Tire - 3900 Frankford Rd
6,952 sq ft · $1.2M est.
- RegisteredJun 10, 2026
- Plan review
- ConstructionOct '26 – Apr '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectProject involves the ground-up construction of a new retail facility designed to accommodate mavis tire shop — mavis tire - 3900 frankford rd
TDLR project registrationNew ConstructionReview Complete6,952 sq ft$1.2M est.- Project #
- TABS2026022510
- Tenant / owner
- Mavis Tire - 3900 Frankford Rd
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3900 Frankford Rd, Dallas, TX 75287
What is being built at 3900 Frankford Road in Dallas?
A new retail facility designed to accommodate a Mavis Tire shop is planned for the site. The TDLR registration describes it as ground-up construction.
Where is the planned Mavis Tire shop in Dallas?
The project is at 3900 Frankford Road, Dallas, TX 75287.
When was the 3900 Frankford Road project filed?
The TDLR project registration, number TABS2026022510, was filed June 10, 2026.
How large is the planned building at 3900 Frankford Road?
The TDLR registration lists a project area of 6,952 square feet.
What is the estimated cost of the Mavis Tire project?
The applicant's estimated cost for the project is $1.2 million, according to the TDLR registration.
What is the status of the 3900 Frankford Road project?
The TDLR registration lists the project status as “Review Complete.”
Also being built nearby
All of 75287- 3900 Frankford RdJun 10, 2026Qteam meeting 6.25.26 (1:30 pm) - this project involves the ground-up construction of a new retail facility designed to accommodate mavis tire shop
- 3855 Frankford RdSep 12, 2026Zo bc addition of a decorative area. the existing flooring will remain; windows and a dishwasher will be added · 89 m away
- 18295 Vail StAug 11, 2026Replacing water heater · 104 m away
- 18208 Muir CirNov 9, 2026Install a new 1-inch pex water service line extending from the existing water meter to the home · 173 m away
- 18212 Muir CirFeb 5, 2026Gas test · 176 m away
- 18232 Muir CirJan 15, 2026Replacing 50 gallon gas water heater in first floor closet · 200 m away
- 3804 Stockton LnJun 1, 2025Reroof shingle onlyoc oakridge driftwood · 240 m away
- 3812 Stockton LnMay 29, 2026Water heater tankless change-out in garage · 249 m away
- 3811 Stockton LnOct 21, 2026Nsfaa 16.5x20 attached carport to the rear · 270 m away
- 3839 Stockton LnJun 24, 202550 gallon gas water heater in garage closet · 297 m away
- 3827 Stockton LnJul 23, 2025Hvac changeout · 304 m away
- 18181 Midway RdJul 15, 2026Electric no work permit.. inspection only · 314 m away