groundranger
Recent · latest filing Jul 2025Residential

4034 Midrose Trl

Dallas, TX 75287

4034 Midrose Trl: 3 projects on record

City of Dallas lists 3 filings across 3 projects at 4034 Midrose Trl, Dallas, TX 75287 since April 4, 2023. The most recent, filed July 15, 2025, covers: “Replace fixtures and gas test”.

Compiled from City of Dallas records · updated Jul 15, 2025

Projects
3
3 filings
Latest filing
Jul 15, 2025
since Apr 4, 2023
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Replace fixtures and gas test

    Replace fixtures and gas test

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-002462
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install 200amp service and missing outlets,light swithces

    Install 200amp service and missing outlets,light swithces

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-000544
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Repair fire damage only, bring back to its original condition, no layout or structural changes allowed-gc must call and pass framing inspection prior to cover. submit any engineered framing drawings if required per field inspector

    Repair fire damage only, bring back to its original condition, no layout or structural changes allowed-gc must call and pass framing inspection prior to cover. submit any engineered framing drawings if required per field inspector

    City of Dallas permitResidential Mechanical Permit
    Record
    2304041025_177172295-001_ME_1
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 4034 Midrose Trl

What is being built at 4034 Midrose Trl?

The latest filing (City of Dallas permit RES-PLM-25-002462, July 15, 2025) covers replace fixtures and gas test.

How many permits and filings does 4034 Midrose Trl have?

3 filings across 3 projects, from April 4, 2023 to July 15, 2025.

Is there other construction near 4034 Midrose Trl?

Yes. Nearby filings include 4038 Midrose Trl (re-roof due to insurance claim. we will be installing owens corning duration shingles, Aug 1, 2025); 4019 Midrose Trl (repair water service, Jun 25, 2025); 4015 Midrose Trl (reroute hot water line overhead, Aug 31, 2026).

How do I get alerts for new permits at 4034 Midrose Trl?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75287
Get alerts for 4034 Midrose Trl