5136-1/2 SH 71
Del Valle, TX 78617
BATX Pipeline site plan approved in Del Valle
A site plan for the BATX Pipeline at 5136-1/2 SH 71 was approved and released on January 6, 2026. The City of Austin case does not list a project size or valuation.
Summarized from City of Austin records · updated Jan 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 6, 2026
- since Jan 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 5136-1/2 SH 71
What is being planned at 5136-1/2 SH 71 in Del Valle?
A City of Austin case describes a site plan for the BATX Pipeline. It was approved and released on January 6, 2026.
What is the BATX Pipeline project?
The available City of Austin record identifies it as a site plan named BATX Pipeline, but does not provide further project details.
When was the BATX Pipeline site plan approved?
The City of Austin case was approved and released on January 6, 2026.
What is the permit or case number for BATX Pipeline in Del Valle?
The City of Austin case number is 13447781. The case date is January 6, 2026.
How large is the BATX Pipeline project at 5136-1/2 SH 71?
The City of Austin record does not list a project size.
How much will the BATX Pipeline project cost?
The available record does not provide a project cost or valuation.
What is planned near Dovetail Custom Woodworks Addition in Del Valle?
A site plan for the BATX Pipeline at 5136-1/2 SH 71 was approved and released on January 6, 2026. The record places Dovetail Custom Woodworks Addition about 413 meters away.
Also being built nearby
All of 78617- 5150 SH 71May 4, 2007Garfield commercial · 88 m away
- 5110 SH 71Aug 15, 2007Del rey development [hog wild bar] (withdrawal & resubmittal of sp-03-0462d) · 210 m away
- 16220 Greenwood DrApr 24, 2019Garfield park (with r sp-2017-0155d) · 347 m away
- 4301 Caldwell LnApr 9, 2009Simcoe subdivision — simcoe subdivision · 376 m away
- 5231 Albert Brown Drive · Half-Blind Farm LLCOct 3, 2026Dovetail custom woodworks addition — additions to existing building — additions to: building. a westside 4900 sq ft, building. a northside 6326 sq ft, canopy b 4070 sq ft, b/c connector 1390 sq ft, building. b northside 840 sq ft, building. b eastside 1082 sq ft, total of 18608 sq ft · 413 m away
- 4210 Houston LnNov 4, 2026Garfield park 1 (phase 2) · 451 m away
- 5191 Albert Brown DrApr 22, 2024New rental equipment facility site plan · 455 m away
- 4215 Caldwell LnMay 7, 2009Travis county fire rescue esd #11-station 1103 · 479 m away
- 5057 SH 71Mar 30, 2011Austin wrench a part · 516 m away