Tetra Pak to replace gas-fired heating at Building 900

Tetra Pak’s Building 900 at 3300 Airport Road is slated to replace natural-gas heating equipment with similarly sized electric units, according to a TDLR project registration filed October 21, 2024. The project also adds an electrical room on the building’s north side; the registration says the current occupancy will not change. The applicant’s estimated project cost is $525,823.

Summarized from Texas Department of Licensing and Regulation records · updated Oct 21, 2024

Projects
1
1 filings
Latest filing
Oct 21, 2024
since Oct 21, 2024
Largest scope
26,245 sf
Estimated cost
$526K
state registration

Where this project stands

Finishing up · inspection next

Tetra Pak – 2024 Denton 900A-P2 Electrification of the Site

26,245 sq ft · $526K est.

  1. RegisteredOct 21, 2024
  2. Plan review
  3. ConstructionJul '24 – Mar '25
  4. Inspectednow
  5. Closed

Scheduled to finish Mar 31, 2025; the state inspection hasn't been filed yet.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Tetra pak industries is replacing natural gas fired heating equipment with new "like size" electrical powered heating units.the current occupancy is not being modified.a new electrical room is being added to the north side of the existing blding 900. — tetra pak building 900

    TDLR project registrationRenovation/AlterationReview Complete26,245 sq ft$526K est.
    Tenant / owner
    Tetra Pak – 2024 Denton 900a-P2 Electrification Of The Site
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 3300 Airport Road

What is being built at 3300 Airport Road in Denton?

The project is an alteration to Tetra Pak Building 900: replacing natural-gas heating equipment with similarly sized electric units and adding an electrical room. The TDLR registration says the building’s current occupancy will not change.

Is Tetra Pak building a new facility at 3300 Airport Road?

The October 21, 2024, TDLR registration describes work on the existing Building 900, not a new facility. It lists the project as a renovation or alteration.

When was the Tetra Pak Building 900 project filed?

The TDLR project registration, TABS2025003687, was filed October 21, 2024. Its status is listed as Review Complete.

What work is planned at Tetra Pak Building 900?

The registration describes replacing gas-fired heating equipment with like-size electric heating units and adding an electrical room on the north side of the existing building.

What's going in next to Tetra Pak Materials on Airport Road?

At 3300 Airport Road, the registered work is an electrification project at Tetra Pak Building 900. It does not indicate a change to the building’s current occupancy.

How much will the Tetra Pak Building 900 project cost?

The applicant’s estimated cost for the project is $525,823, according to the TDLR registration. This is an estimate, not a final reported project cost.