5311 N I35
Denton, TX 76207 · Lumen Denton Shelters
Two equipment shelters planned at 5311 N I-35
A TDLR registration filed January 27, 2025, describes two prefabricated equipment shelters at 5311 N I-35 in Denton. The work includes extending existing concrete pads and installing a new meter and meter rack. The applicant estimated the project cost at $687,000.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 27, 2025
- since Jan 27, 2025
- Largest scope
- 1,300 sf
- Estimated cost
- $687K
- state registration
Where this project stands
Finishing up · inspection nextLumen Denton Shelters
1,300 sq ft · $687K est.
- RegisteredJan 27, 2025
- Plan review
- ConstructionFeb '25 – Jun '25
- Inspectednow
- Closed
Scheduled to finish Jun 23, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInstall two (2) prefabricated equipment shelters. extend existing concrete pads, install new meter/ meter rack and. 1 single-wide shelter (432 sq ft) and 1 double-wide shelter (864 sq ft) — lumen denton shelters
TDLR project registrationNew ConstructionReview Complete1,300 sq ft$687K est.- Project #
- TABS2025010414
- Tenant / owner
- Lumen Denton Shelters
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 5311 N I35
What is being built at 5311 N I-35 in Denton?
A TDLR registration describes one 432-square-foot shelter and one 864-square-foot shelter, for 1,300 square feet combined. The work also includes extending existing concrete pads and installing a meter and meter rack.
When was the project at 5311 N I-35 filed?
The TDLR project registration, TABS2025010414, was filed January 27, 2025. Its status is listed as Review Complete.
How large are the planned equipment shelters in Denton?
The registration lists a 432-square-foot single-wide shelter and an 864-square-foot double-wide shelter. Together, they total 1,300 square feet.
What is the estimated cost of the 5311 N I-35 project?
The applicant's TDLR estimate for the project is $687,000. This is an estimate, not a confirmed final project cost.
What's being built near Sv Presidio on North Interstate 35?
At 5311 N I-35, a TDLR registration describes two prefabricated equipment shelters and related site work. The registration was filed January 27, 2025.