2400 Aviation Dr
Dfw Airport, TX 75261 · Terminal Accessibility Loading Zones Improvements - Terminal B Upper Level, Dfw Terminal B Parking Garage Rehabilitation (section A) + 12 more
DFW Terminal B upgrades and Chick-fil-A finish-out
TDLR registrations list passenger loading-zone improvements and parking-garage rehabilitation at Terminal B, along with a Chick-fil-A tenant finish-out at Terminal A. The registrations were filed between November 12, 2025, and May 7, 2026.
Summarized from Texas Department of Licensing and Regulation records · updated May 7, 2026
- Projects
- 14
- 14 filings
- Latest filing
- May 7, 2026
- since Jul 26, 2024
- Largest scope
- 136,600 sf
- Estimated cost
- $12M
- state registration
Where this project stands
Under constructionTerminal Accessibility Loading Zones Improvements - Terminal B Upper Level
6,200 sq ft · $600K est.
- RegisteredMay 7, 2026
- Plan review
- ConstructionAug '26 – Nov '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
14 projectsInstall 17 passenger loading zones (~6,200 sq ft) on the upper level roadways at terminal b. this includes removing sidewalk to create access aisles and installing parallel curb ramps. — enplaning and deplaning roads
TDLR project registrationRenovation/AlterationReview Complete6,200 sq ft$600K est.- Project #
- TABS2026019721
- Tenant / owner
- Terminal Accessibility Loading Zones Improvements - Terminal B Upper Level
- Design firm
- Pro
- Contact
- Pro
136,600 sq ft of remediation to address structural, mechanical, and electrical deficiencies, while improving signage/wayfinding. — dfw terminal b parking garage
TDLR project registrationRenovation/AlterationReview Complete136,600 sq ft$12M est.- Project #
- TABS2026009005
- Tenant / owner
- Dfw Terminal B Parking Garage Rehabilitation (section A)
- Design firm
- Pro
- Contact
- Pro
Tenant finish out of a qsr in the pier expansion in a white box — dfw airport
TDLR project registrationRenovation/AlterationInspection Complete2,499 sq ft$2.5M est.- Project #
- TABS2026005671
- Tenant / owner
- Chick Fil A - Terminal A Pier
- Design firm
- Pro
- Contact
- Pro
Office renovation — dfw international airport terminal e e1-33c
TDLR project registrationRenovation/AlterationReview Complete1,591 sq ft$500K est.- Project #
- TABS2025007134
- Tenant / owner
- Office Renovations
- Design firm
- Pro
- Contact
- Pro
Interior renovation of three sets of restrooms at dfw airport. restrooms are located in terminal a (2,929 sq ft). renovation includes relocation of an existing ticketstock storage room to a new space in the ramp level at a/c connector. — terminal a
TDLR project registrationRenovation/AlterationReview Complete4,000 sq ft$4.5M est.- Project #
- TABS2024026390
- Tenant / owner
- Dfw Holistic Airport Restroom Program - Group 1
- Design firm
- Pro
- Contact
- Pro
Removal of sinks in men's , women's and family toilet rooms in like kind. sinks deteriorated and new sinks are by a different manufacturer to take more traffic/ abuse. — dfw terminal a
TDLR project registrationRenovation/AlterationProject Closed2,400 sq ft$400K est.- Project #
- TABS2024024031
- Tenant / owner
- Dfw A29 Sink Replacement
- Design firm
- Pro
- Contact
- Pro
Reconfiguration of existing spaces to accommodate new tenants with added coffee bar, break rooms, and office space. total scope estimated square footage is 726. — dfw terminal c
TDLR project registrationRenovation/AlterationProject Registered726 sq ft$100K est.- Project #
- TABS2024006175
- Tenant / owner
- Dfw- Tc Fit Out - Customer Care - 634
- Design firm
- Pro
- Contact
- Pro
Reconfiguration of existing spaces to accommodate new tenants. total scope estimated square footage is 3,875. — dfw terminal c
TDLR project registrationRenovation/AlterationProject Registered3,875 sq ft$100K est.- Project #
- TABS2024006178
- Tenant / owner
- Dfw- Tc Fit Out - Prospect - 635
- Design firm
- Pro
- Contact
- Pro
Reconfiguration of existing spaces to accommodate new tenants with added coffee bar, break rooms, and office space. total scope estimated square footage is 477. — dfw terminal c
TDLR project registrationRenovation/AlterationProject Closed477 sq ft$100K est.- Project #
- TABS2024006183
- Tenant / owner
- Dfw- Tc Fit Out - Allied Aviation Break Room - 0ab
- Design firm
- Pro
- Contact
- Pro
Renovation of existing concourse-level interior space at terminal b. the renovated space will include a men's restroom, a women's restroom, a family restroom, and a janitor's room. — dfw airport
TDLR project registrationRenovation/AlterationProject Closed2,700 sq ft$200K est.- Project #
- TABS2023023742
- Tenant / owner
- American Airlines Dfw B-Mainline - B14 Restrooms
- Design firm
- Pro
- Contact
- Pro
Reconfiguration of the parking call center located at level 02 of dfw headquarters. two partitions will be partially demolished. furniture to be reconfigured by dfw contractors. — dfw headquarters
TDLR project registrationRenovation/AlterationProject Closed2,000 sq ft$200K est.- Project #
- TABS2023022967
- Tenant / owner
- Dfw Hq - Parking Call Center Expansion
- Design firm
- Pro
- Contact
- Pro
Renovated existing concession space — dfw the bridge - terminal a
TDLR project registrationRenovation/AlterationProject Closed960 sq ft$300K est.- Project #
- TABS2023019186
- Tenant / owner
- Dfw The Bridge - Terminal A
- Design firm
- Pro
- Contact
- Pro
Renovation of existing holdroom space to support conversion from regional aircraft to mainline aircraft. gate door infill, flooring replacement, and furniture replacement are included in scope. — dfw airport
TDLR project registrationRenovation/AlterationProject Closed13,950 sq ft$500K est.- Project #
- TABS2023014616
- Tenant / owner
- American Airlines Dfw B-Mainline - Holdrooms
- Design firm
- Pro
- Contact
- Pro
Moving existing strobes and occupancy sensors from wall to ceiling and changing single door to double door — dfw - terminal e
TDLR project registrationRenovation/AlterationReview Complete17,706 sq ft$250K est.- Project #
- TABS2023013306
- Tenant / owner
- Terminal E Connector Phase 1
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2400 Aviation Dr
What is being built at 2400 Aviation Dr?
TDLR records list three projects associated with the address: 17 passenger loading zones at Terminal B, rehabilitation of the Terminal B parking garage, and a Chick-fil-A tenant finish-out at the Terminal A pier.
What are the Terminal B loading-zone improvements?
The project calls for 17 passenger loading zones on Terminal B’s upper-level enplaning and deplaning roads, with access aisles and parallel curb ramps. It was registered May 7, 2026, as TABS2026019721.
Is the Terminal B parking garage being renovated?
A TDLR registration describes rehabilitation of 136,600 square feet of the Terminal B parking garage to address structural, mechanical, and electrical deficiencies and improve signage and wayfinding. The registration, TABS2026009005, is dated December 29, 2025.
Is a Chick-fil-A opening at DFW Airport?
A TDLR registration lists a Chick-fil-A tenant finish-out in the Terminal A pier expansion. The registration, TABS2026005671, is dated November 12, 2025, and does not provide an opening date.
How many passenger loading zones are planned at Terminal B?
The registered project calls for 17 passenger loading zones on the upper-level roadways at Terminal B. It was filed May 7, 2026.
Are all the projects at this address part of Terminal B?
No. Two registrations describe Terminal B projects: loading-zone improvements and parking-garage rehabilitation. The third is a Chick-fil-A tenant finish-out at the Terminal A pier.
More warehouses & industrial in 75261, offices in 75261, parking structures in 75261.