groundranger
Recent · latest filing Jul 2026Commercial

2400 Aviation Drive

Dfw Airport, TX 75261 · American Airlines Flagship Check-In Dfw D, American Airlines Dfw B Renovation - Concessions To Holdrooms + 35 more

DFW Airport renovations include a Flagship check-in lounge

Several interior renovations are planned at this multi-tenant airport site, including a check-in lounge in existing American Airlines space, Terminal B holdroom work, and office renovations. TDLR registrations for the projects were filed from October 28, 2025, through July 23, 2026.

Summarized from Texas Department of Licensing and Regulation records · updated Jul 23, 2026

Projects
39
39 filings
Latest filing
Jul 23, 2026
since Feb 28, 2024
Largest scope
283,500 sf
Estimated cost
$80M
state registration

Where this project stands

In state plan review

American Airlines Flagship Check-In DFW D

1,800 sq ft · $2.5M est.

  1. RegisteredJul 23, 2026
  2. Plan reviewnow
  3. ConstructionAug '26 – Dec '26
  4. Inspected
  5. Closed

Design is filed with the state. Subcontractors and suppliers are usually picked around now.

4 contacts on this project · 3 phone numbers

Permit & project history

39 projects
  1. Upfit existing american airlines leased space to accommodate a check-in lounge for their premium clients. no food or beverage service. approx 1800 sq feet — dallas-fort worth international airport

    TDLR project registrationRenovation/AlterationProject Registered1,800 sq ft$2.5M est.
    Tenant / owner
    American Airlines Flagship Check-In Dfw D
    Design firm
    Pro
    Contact
    Pro
  2. Demolition of the existing concourse level interior concessions space to be converted to holdroom for gates b16 and b17. the renovations will include new carpet, furniture and ceilings. — dfw airport

    TDLR project registrationRenovation/AlterationReview Complete1,100 sq ft$200K est.
    Tenant / owner
    American Airlines Dfw B Renovation - Concessions To Holdrooms
    Design firm
    Pro
    Contact
    Pro
  3. Removal and relocation of cuss kiosks (passenger check in kiosks) - 800 square feet — dfw airport terminal e

    TDLR project registrationRenovation/AlterationReview Complete800 sq ft$125K est.
    Tenant / owner
    Dfw Cuss Kiosk Removal & Replacement
    Design firm
    Pro
    Contact
    Pro
  4. Removal and relocation of cuss kiosks (passenger check in kiosks) - 500 square feet — dfw airport terminal d

    TDLR project registrationRenovation/AlterationReview Complete500 sq ft$125K est.
    Tenant / owner
    Dfw Cuss Kiosk Removal & Replacement
    Design firm
    Pro
    Contact
    Pro
  5. Interior renovation to existing office space. — dfw headquarters

    TDLR project registrationRenovation/AlterationInspection Complete800 sq ft$2.0M est.
    Tenant / owner
    Dfw Innovation Avp Office
    Design firm
    Pro
    Contact
    Pro
  6. DFW AHQ Priority 1

    Interior renovation to an existing office space. — dfw headquarters

    TDLR project registrationRenovation/AlterationInspection Complete5,500 sq ft$500K est.
    Tenant / owner
    Dfw Ahq Priority 1
    Design firm
    Pro
    Contact
    Pro
  7. Renovation of existing concourse level interior space at terminal b. the renovated space will include office and support space that will be used by dfw employees. the project area is approximately 15,230 sq ft — dfw airport

    TDLR project registrationRenovation/AlterationReview Complete15,230 sq ft$8.8M est.
    Tenant / owner
    American Airlines Dfw B Renovation - Access Control Office
    Design firm
    Pro
    Contact
    Pro
  8. Renovation of existing ramp level interior space at terminal e. renovations include a ready room which will be used by envoy employees. — dfw airport - terminal e

    TDLR project registrationRenovation/AlterationProject Closed547 sq ft$100K est.
    Tenant / owner
    American Airlines Dfw E - Envoy Ready Room
    Design firm
    Pro
    Contact
    Pro
  9. DFW AHQ Security Entry

    New control access entry with optical swinging turnstiles and existing kiosk relocation in existing first level entry lobby. approx. 250 sq ft — dfw airport headquarters

    TDLR project registrationRenovation/AlterationInspection Complete250 sq ft$300K est.
    Tenant / owner
    Dfw Ahq Security Entry
    Design firm
    Pro
    Contact
    Pro
  10. Renovation of existing concourse level interior holdroom space at terminal b. renovations include shortened pacs, new carpet, new dynamic signage, and reconfigured furniture. the project area is approximately 15,600 sq ft — dfw airport

    TDLR project registrationRenovation/AlterationReview Complete15,600 sq ft$2.0M est.
    Tenant / owner
    American Airlines Dfw B Renovation - Holdrooms B9-B12
    Design firm
    Pro
    Contact
    Pro
  11. Renovation of existing concourse level interior space at terminal b. renovations include office and support space which will be used by dfw employees. the project area is approximately 7,424 sq ft — dfw airport

    TDLR project registrationRenovation/AlterationInspection Complete7,424 sq ft$500K est.
    Tenant / owner
    American Airlines Dfw B Renovation - Driver Simulator
    Design firm
    Pro
    Contact
    Pro
  12. Interior fit out for offices, restroom and break rooms at the new pier in terminal a. (51,000sf) — dfw airport

    TDLR project registrationRenovation/AlterationProject Registered51,000 sq ft$5.0M est.
    Tenant / owner
    Dfw Int'l Airport Pier A Ramp Level - Phase 1a (south) - Interior Fit Out
    Design firm
    Pro
    Contact
    Pro
  13. Interior fit out for baggage claim/baggage area, security check point, concessions white boxes, offices, restroom and break rooms at the new pier in terminal a. (283,500sf) — dfw airport

    TDLR project registrationRenovation/AlterationProject Registered283,500 sq ft$80M est.
    Tenant / owner
    Dfw Int'l Airport Terminal C And Pier C Ramp Level - Phase 1a (south) - Interior Fit Out
    Design firm
    Pro
    Contact
    Pro
  14. Interior renovation of three sets of restrooms at dfw airport. restrooms are located in terminal e (1,973 sq ft) — terminal e

    TDLR project registrationRenovation/AlterationReview Complete1,973 sq ft$4.0M est.
    Tenant / owner
    Dfw Holistic Airport Restroom Program - Group 1
    Design firm
    Pro
    Contact
    Pro
  15. Interior renovation of three sets of restrooms at dfw airport. restrooms are located in terminal b (1,874 sq ft) — terminal b

    TDLR project registrationRenovation/AlterationReview Complete1,874 sq ft$3.8M est.
    Tenant / owner
    Dfw Holistic Airport Restroom Program - Group 1
    Design firm
    Pro
    Contact
    Pro
  16. Installation of dedicated circuits, duplex receptacles, and parking positions for golf cart parking in terminals d, b-d connector, and terminal c — terminal d, b-d connector, terminal c

    TDLR project registrationRenovation/AlterationProject Registered1,500 sq ft$105K est.
    Tenant / owner
    Dfw Terminal Golf Cart Parking Locations
    Design firm
    Pro
    Contact
    Pro
  17. Installation of new canopy for the outbound bhs supporting the terminal c renovation project. 3338 sq ft — dfw airport

    TDLR project registrationRenovation/AlterationReview Complete3,338 sq ft$1.1M est.
    Tenant / owner
    Aa Dfw Terminal C - C4 Canopy
    Design firm
    Pro
    Contact
    Pro
  18. Replacement of floor and wall finishes and the installation of overhead sound absorption materials. — dfw airport headquarters (ahq)

    TDLR project registrationRenovation/AlterationReview Complete300 sq ft$75K est.
    Tenant / owner
    Dfw Ahq Acoustic Improvements
    Design firm
    Pro
    Contact
    Pro
  19. Reconfiguration of existing space to accommodate new tenants. total scope includes adding in a 6'-8' tall chain link fence, storage pallets, lockers, two sinks, ice makers, and freezers. total square footage is 1000 sq ft — dfw terminal c

    TDLR project registrationRenovation/AlterationReview Complete1,000 sq ft$100K est.
    Tenant / owner
    Dfw- Tc Fit Out - Aa Hydration Program - 263
    Design firm
    Pro
    Contact
    Pro
  20. Reconfiguration of existing space to accommodate new tenants including new office, storage closets, water line for water dispenser, and exercise space with added power drops to accommodate various types of gym equipment. — dfw terminal c

    TDLR project registrationRenovation/AlterationProject Closed1,200 sq ft$150K est.
    Tenant / owner
    Dfw- Tc Fit Out - Aa Employee Gym 266
    Design firm
    Pro
    Contact
    Pro
  21. Reconfiguration of existing space to accommodate new tenants. total scope includes two new offices and a new coffee bar. total area: 1,326 sq ft — dfw terminal a

    TDLR project registrationRenovation/AlterationProject Closed1,326 sq ft$100K est.
    Tenant / owner
    Dfw- Tc Fit Out - Aa Employee Assistance Program - Eap
    Design firm
    Pro
    Contact
    Pro
  22. Expansion into two adjacent spaces and some minor renovations within the existing space — dfw airport

    TDLR project registrationRenovation/AlterationInspection Complete1,500 sq ft$80K est.
    Tenant / owner
    Chick Fil A Expansion - Terminal E
    Design firm
    Pro
    Contact
    Pro
  23. The Club DFW expansion

    Interior renovation of an existing tenant space — dfw international airport terminal d

    TDLR project registrationRenovation/AlterationProject Closed2,426 sq ft$1.5M est.
    Tenant / owner
    The Club Dfw Expansion
    Design firm
    Pro
    Contact
    Pro
  24. Alteration of existing space to create office and training room with coffee bar with sink. — dfw terminal c

    TDLR project registrationRenovation/AlterationProject Closed690 sq ft$75K est.
    Tenant / owner
    Dfw Tc Fit Out - Abm Training & Offices
    Design firm
    Pro
    Contact
    Pro
  25. Reconfiguration of existing room to provide storage space. — dfw terminal c

    TDLR project registrationRenovation/AlterationProject Registered388 sq ft$50K est.
    Tenant / owner
    Dfw Tc Fit Out -Tsa Storage - 436
    Design firm
    Pro
    Contact
    Pro
  26. Alteration of existing room to add a storage space and secure storage room. — dfw terminal c

    TDLR project registrationRenovation/AlterationProject Registered600 sq ft$75K est.
    Tenant / owner
    Dfw Tc Fit Out - Tsa Hazmat And Tsa Storage - 288
    Design firm
    Pro
    Contact
    Pro
  27. Reconfiguration of existing conference room to add coffee bar with sink, unisex restroom and storage room. addition of new exterior door required for egress. — dfw terminal c

    TDLR project registrationRenovation/AlterationProject Closed593 sq ft$75K est.
    Tenant / owner
    Dfw Tc Fit Out - Corporate Security - 005
    Design firm
    Pro
    Contact
    Pro
  28. New break room and office build-out for ramp employees on ramp level of terminal b. — dfw airport

    TDLR project registrationRenovation/AlterationProject Closed3,605 sq ft$300K est.
    Tenant / owner
    American Airlines Dfw B-Mainline - Psa-Prospect
    Design firm
    Pro
    Contact
    Pro
  29. Replacement of existing carpet tiles — terminal d

    TDLR project registrationRenovation/AlterationProject Closed22,300 sq ft$135K est.
    Tenant / owner
    Dfw Cbp Carpet Replacement - Phase 1
    Design firm
    Pro
    Contact
    Pro
  30. This project is for the fit out of an existing retail space — dallas-fort worth international airport terminal a

    TDLR project registrationRenovation/AlterationProject Closed600 sq ft$285K est.
    Tenant / owner
    Toys R US Boutique A-2-097f-A01
    Design firm
    Pro
    Contact
    Pro
  31. This project is for the fit out of an existing retail space — dallas-fort worth international airport terminal d

    TDLR project registrationRenovation/AlterationProject Closed1,035 sq ft$647K est.
    Tenant / owner
    Shade Boutique D-2-Sc122b
    Design firm
    Pro
    Contact
    Pro
  32. This project is for the fit out of an existing retail space — dallas-fort worth international airport terminal d

    TDLR project registrationRenovation/AlterationProject Closed1,165 sq ft$641K est.
    Tenant / owner
    New Lego Boutique D-2-Sc122a
    Design firm
    Pro
    Contact
    Pro
  33. Interior finish-out of an existing space. a few new doors added into the space with one new office and several half-height walls. the rest of the space has furniture. — dfw international airport - terminal e

    TDLR project registrationRenovation/AlterationProject Closed3,600 sq ft$450K est.
    Tenant / owner
    United/Mesa Interior Renovation
    Design firm
    Pro
    Contact
    Pro
  34. Interior renovation of existing space into rebooking center and deferred concessions space. — dfw airport

    TDLR project registrationRenovation/AlterationProject Closed2,200 sq ft$200K est.
    Tenant / owner
    American Airlines Dfw B-Mainline - Rebooking Center
    Design firm
    Pro
    Contact
    Pro
  35. Expansion of existing ticket counter spaces, extension of bag belt, and renovation of tsa over-sized bag room. — dfw airport

    TDLR project registrationRenovation/AlterationProject Closed6,850 sq ft$500K est.
    Tenant / owner
    American Airlines Dfw B-Mainline - Ticket Counters
    Design firm
    Pro
    Contact
    Pro
  36. Interior renovation of unoccupied space into tsa central monitoring facility. — dfw airport

    TDLR project registrationRenovation/AlterationProject Closed4,150 sq ft$500K est.
    Tenant / owner
    American Airlines Dfw B-Mainline - Tsa Cmf
    Design firm
    Pro
    Contact
    Pro
  37. New break room build-out for ramp employees on ramp level of terminal b — dfw airport

    TDLR project registrationRenovation/AlterationProject Closed1,640 sq ft$500K est.
    Tenant / owner
    American Airlines Dfw B-Mainline - B-Stinger Break Room
    Design firm
    Pro
    Contact
    Pro
  38. Interior renovation of employee inspection portal. — dfw airport

    TDLR project registrationRenovation/AlterationProject Closed1,520 sq ft$300K est.
    Tenant / owner
    American Airlines Dfw B-Mainline - Employee Portal
    Design firm
    Pro
    Contact
    Pro
  39. Interior renovation of ramp level tech ops support space in terminal b — dfw airport

    TDLR project registrationRenovation/AlterationProject Closed8,740 sq ft$100K est.
    Tenant / owner
    American Airlines Dfw B-Mainline - Tech Ops
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2400 Aviation Drive

What is being built at 2400 Aviation Drive?

TDLR records list several renovations to existing airport spaces, including a check-in lounge, Terminal B holdroom work, kiosk relocations, and office renovations. The records describe interior upgrades rather than a new standalone building.

Is American Airlines opening a lounge at DFW Airport?

A July 23, 2026, TDLR registration describes an upfit of existing American Airlines leased space for a Flagship check-in lounge for premium clients. It says the lounge will not have food or beverage service; no opening date is listed.

What changes are planned in Terminal B at DFW?

One project converts existing concourse concessions space into a holdroom for gates B16 and B17, with new carpet, furniture, and ceilings. The registration, TABS2026025355, was filed July 15, 2026.

Are check-in kiosks being moved at DFW Airport?

Yes. TDLR registrations filed June 24, 2026, describe removing and relocating passenger check-in kiosks in Terminals D and E. The project records list 500 square feet in Terminal D and 800 square feet in Terminal E.

What office renovations are planned at DFW Airport?

The registrations include interior renovations to existing office space at DFW headquarters. Projects were filed May 8, 2026, and November 17, 2025.

When were the DFW Airport projects registered?

The TDLR records span October 28, 2025, through July 23, 2026. The earliest listed project is an access-control office renovation in Terminal B, and the latest is the Flagship check-in lounge upfit.

More demolitions in 75261, gyms & fitness in 75261, warehouses & industrial in 75261.

Email me when plan review is complete