groundranger
Recent · latest filing Jan 2026Commercial

940 US-290, , TX

Dripping Springs, TX 78620 · Dripping Springs Independent School District

Dripping Springs High School renovation covers 245,000 square feet

A two-phase summer renovation is planned for about 245,000 square feet of the existing Dripping Springs High School at 940 US-290. The project was registered with TDLR on January 28, 2026, and includes replacing ceilings, casework, wall and floor finishes, along with upgrades to mechanical systems.

Summarized from Texas Department of Licensing and Regulation records · updated Jan 28, 2026

Projects
1
1 filings
Latest filing
Jan 28, 2026
since Jan 28, 2026
Largest scope
245,000 sf
Estimated cost
$41M
state registration

Where this project stands

Under construction

DSHS - Capital Improvements and Renovations

245,000 sq ft · $41M est.

  1. RegisteredJan 28, 2026
  2. Plan review
  3. ConstructionMay '26 – Jul '28
  4. Inspected
  5. Closed
23% through of a 26-month buildMay 22, 2026 → Jul 31, 2028

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. A two-phase summer renovation encompassing approximately 245,000 square feet within an existing 400,000 square foot high school. the scope includes the replacement of ceilings, casework, wall and floor finishes, and comprehensive upgrades to mechanic — dripping springs high school

    TDLR project registrationRenovation/AlterationReview Complete245,000 sq ft$41M est.
    Tenant / owner
    Dshs - Capital Improvements And Renovations
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 940 US-290, , TX

What is being renovated at 940 US-290 in Dripping Springs?

A two-phase summer renovation will cover about 245,000 square feet of the existing Dripping Springs High School. The scope includes new ceilings, casework, wall and floor finishes, and mechanical upgrades.

When was the Dripping Springs High School renovation filed?

The project was registered with the Texas Department of Licensing and Regulation on January 28, 2026. Its registration number is TABS2026011132.

How much will the Dripping Springs High School renovation cost?

The TDLR registration lists an estimated project cost of $40.5 million. This is the applicant's estimate for the project.

How much of Dripping Springs High School is being renovated?

The renovation is listed as covering approximately 245,000 square feet within the existing 400,000-square-foot high school.

What's being built near Home Grown Farm & Ranch in Dripping Springs?

About 234 meters from the high school project, a separate filing describes a remodel of an existing residence into a farm and ranch food market, plus a new two-suite rental unit. That work is listed at 101 Retha Drive.

Also being built nearby

All of 78620

More schools & daycares in 78620.

Email me when it passes inspection