940 US-290, , TX
Dripping Springs, TX 78620 · Dripping Springs Independent School District
Dripping Springs High School renovation covers 245,000 square feet
A two-phase summer renovation is planned for about 245,000 square feet of the existing Dripping Springs High School at 940 US-290. The project was registered with TDLR on January 28, 2026, and includes replacing ceilings, casework, wall and floor finishes, along with upgrades to mechanical systems.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 28, 2026
- since Jan 28, 2026
- Largest scope
- 245,000 sf
- Estimated cost
- $41M
- state registration
Where this project stands
Under constructionDSHS - Capital Improvements and Renovations
245,000 sq ft · $41M est.
- RegisteredJan 28, 2026
- Plan review
- ConstructionMay '26 – Jul '28
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectA two-phase summer renovation encompassing approximately 245,000 square feet within an existing 400,000 square foot high school. the scope includes the replacement of ceilings, casework, wall and floor finishes, and comprehensive upgrades to mechanic — dripping springs high school
TDLR project registrationRenovation/AlterationReview Complete245,000 sq ft$41M est.- Project #
- TABS2026011132
- Tenant / owner
- Dshs - Capital Improvements And Renovations
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 940 US-290, , TX
What is being renovated at 940 US-290 in Dripping Springs?
A two-phase summer renovation will cover about 245,000 square feet of the existing Dripping Springs High School. The scope includes new ceilings, casework, wall and floor finishes, and mechanical upgrades.
When was the Dripping Springs High School renovation filed?
The project was registered with the Texas Department of Licensing and Regulation on January 28, 2026. Its registration number is TABS2026011132.
How much will the Dripping Springs High School renovation cost?
The TDLR registration lists an estimated project cost of $40.5 million. This is the applicant's estimate for the project.
How much of Dripping Springs High School is being renovated?
The renovation is listed as covering approximately 245,000 square feet within the existing 400,000-square-foot high school.
What's being built near Home Grown Farm & Ranch in Dripping Springs?
About 234 meters from the high school project, a separate filing describes a remodel of an existing residence into a farm and ranch food market, plus a new two-suite rental unit. That work is listed at 101 Retha Drive.
Also being built nearby
All of 78620- 101 Retha Drive · Home Grown Farm And Ranch II LLCMar 4, 2026Remodel for home grown farm & ranch — renovation/alteration — remodel of existing wood framed residence into farm and ranch food market and construction of a new 2 suite rental unit and associated driveways and parking. existing remodel - 2441 sq ft, new construction - 2294 sq ft · 234 m away
- 249 Sportsplex Dr · Intrepid Commerical PropertiesMay 16, 2025Spero physical thearpy — new construction — tenant build out to include plumbing, electrical, hvac, gdw partitions, millwork, and final finishes · 405 m away