1600 Montana Avenue
El Paso, TX 79901 · Emergence Health Network
Emergence Health Network office remodel in El Paso
A 5,380-square-foot remodel of administrative spaces is planned inside an existing building at 1600 Montana Avenue for Emergence Health Network. The TDLR project registration was filed May 19, 2026, and lists an estimated project cost of $1.4 million.
Summarized from Texas Department of Licensing and Regulation records · updated May 19, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 19, 2026
- since May 19, 2026
- Largest scope
- 5,380 sf
- Estimated cost
- $1.4M
- state registration
Where this project stands
Under constructionTenant Improvement for Emergence Health Network
5,380 sq ft · $1.4M est.
- RegisteredMay 19, 2026
- Plan review
- ConstructionJun '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectRemodel admistrative spaces in an existing building — emergence health network
TDLR project registrationRenovation/AlterationReview Complete5,380 sq ft$1.4M est.- Project #
- TABS2026020741
- Tenant / owner
- Tenant Improvement For Emergence Health Network
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1600 Montana Avenue
What is being built at 1600 Montana Avenue in El Paso?
The project is a remodel of administrative spaces in an existing building for Emergence Health Network. The TDLR registration lists 5,380 square feet.
Is Emergence Health Network building a new facility at 1600 Montana Avenue?
The registration describes a renovation of administrative spaces inside an existing building, not new construction. It was filed May 19, 2026.
How much will the Emergence Health Network remodel cost?
The TDLR registration lists an estimated project cost of $1.4 million. This is the applicant's estimate for the project.
What is being remodeled near Laurel Business Office in El Paso?
About 501 meters from Laurel Business Office, a 5,380-square-foot administrative-space remodel for Emergence Health Network is registered at 1600 Montana Avenue. The filing date is May 19, 2026.
What is the permit number for the 1600 Montana Avenue remodel?
The TDLR project registration number is TABS2026020741. It was filed May 19, 2026, and its status is listed as Review Complete.
When was the Emergence Health Network project at 1600 Montana Avenue filed?
The TDLR registration was filed May 19, 2026. It describes a renovation and alteration of administrative spaces in an existing building.
Also being built nearby
All of 79901- 1701 E. Yandell Drive · Pcm Capital Investments, LLCApr 4, 2025Office building addition — renovation/alteration — office addition of approximately. 400 s.f. including related site work · 168 m away
- 1810 Wyoming · Trevino Place III LLCOct 22, 20251331 lee trevino - trevino place — renovation/alteration — facade improvements; no additional square footage added, but exterior wall was penetrated exposing interior space · 393 m away
- 1700 E. Cliff Dr · Ep Cliff LLCOct 1, 2024Center of the heart ct suite ti — renovation/alteration — existing suite tenant improvement & shell space build out for new medical office suite for cardiology practice · 465 m away
- 1700 E Cliff Drive · Ep Cliff LLCMar 18, 2025Quest - el paso, tx — renovation/alteration — remodel of existing quest patient service center · 465 m away
- 900 N. Cotton Street · El Paso Independent School DistrictJan 16, 2025Episd campus vestibules region 3 24.555b — renovation/alteration — construction of access-controlled vestibule at campus main entry · 493 m away
- 609 N Laurel St · Romay Tower Properties, LLCOct 14, 2026Laurel business office — renovation/alteration — 5,503 sq ft tenant improvement– office remodel · 501 m away
- 1625 Medical Center · Tenet Health Inc.Jul 2, 20242nd floor new bi-plane procedure room — renovation/alteration — interior demolition and build-out of a new procedure room for a bi-plane machine · 522 m away
- 1625 Medical Center Street · Sierra Medical CenterOct 1, 2026Ct scan equipment replacement — renovation/alteration — replacement of new ct equipment · 522 m away
- 1625 Medical Center Dr · Tenet HealthcareJun 25, 2026Sierra medical center concession stand — renovation/alteration — a tenant improvement for a concession stand inside the hospitals of providence sierra campus · 522 m away
- 2000 Wyoming Ave · Tecma BuildingSep 16, 2024Tecma vestibule improvement — additions to existing building — new vestibule addition along with site work improvements to address an accessibility entrance to the main building. site work improvement consist of ramp, stairs, clear landings and accessible door entrances · 565 m away
- 809 Eucalyptus St · Control & Equipment CompanyAug 13, 2024Warehouse remodeling — renovation/alteration — demolition of existing dwelling unit used for storage, construction of new storage facility · 566 m away
- 1230 Wyoming Avenue · Oak Tree Realty, LLCSep 18, 2026Glias coffee — renovation/alteration — coffee shop tenant improvements in an existing two story commercial building · 569 m away