400 S. Oregon
El Paso, TX 79901 · Belclaire Realty, Ltd.
Selective demolition and white-box shell at 400 S. Oregon
A project at 400 S. Oregon calls for selective demolition of the existing 17,806-square-foot building and a 11,986-square-foot white-box shell for Tenant 1. The TDLR project registration was filed April 11, 2024, under project number TABS2024015968.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 11, 2024
- since Apr 11, 2024
- Largest scope
- 17,806 sf
- Estimated cost
- $700K
- state registration
Where this project stands
CompletedMercado Paisano White Box Shell - Tenant 1
17,806 sq ft · $700K est.
- RegisteredApr 11, 2024
- Plan review
- ConstructionMay '24 – Sep '24
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectSelective demolition to entire 17,806 sq ft of existing building and white box shell for 11,986 for tenant 1. — mercado paisano
TDLR project registrationRenovation/AlterationProject Closed17,806 sq ft$700K est.- Project #
- TABS2024015968
- Tenant / owner
- Mercado Paisano White Box Shell - Tenant 1
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 400 S. Oregon
What is being built at 400 S. Oregon in El Paso?
The project registration describes selective demolition of the existing building and a 11,986-square-foot white-box shell for Tenant 1. It is associated with the project name Mercado Paisano White Box Shell.
When was the project at 400 S. Oregon registered?
The TDLR registration was filed April 11, 2024. The project number is TABS2024015968.
Is Mercado Paisano opening at 400 S. Oregon?
The registration is titled Mercado Paisano White Box Shell - Tenant 1 and describes a shell space for a tenant. It does not confirm an opening date or provide further details about the tenant.
How large is the project at 400 S. Oregon?
The existing building is listed as 17,806 square feet, with a 11,986-square-foot white-box shell in the project description.
What is the estimated cost of the 400 S. Oregon project?
The TDLR registration lists an estimated project cost of $700,000. This is the applicant's estimate.
What is being built near Mesa Bar and Club Ti on S. Oregon?
At 400 S. Oregon, the TDLR registration describes selective demolition and a 11,986-square-foot white-box shell for Tenant 1. The registration was filed April 11, 2024.
Also being built nearby
All of 79901- 602 South Oregonn St · Catholic Properties Of El PasoNov 18, 2025Sacred heart catholic church exterior restoration — renovation/alteration — exterior wall facade restoration + alternate sidewalk modification · 193 m away
- 211 S Mesa St · Mesa Bar And Club TiOct 23, 2024Mesa bar and club ti — renovation/alteration — two story building: 1st floor 2,200 sq ft, 2nd floor 4,850 sq ft · 220 m away
- 623 S. El Paso Street · Cocoina 33Jun 20, 2024Cocona 33 — renovation/alteration — tenant improvement · 224 m away
- 304 E Overland Ave · Flor De Barro Art GalleryJul 6, 2026Flor de barro art gallery — renovation/alteration — renovation of an existing 3,354 sq ft commercial building for use as an art gallery on the ground floor with basement storage, including associated architectural, structural, mechanical, electrical, and plumbing modifications as required · 240 m away
- 600 S. Stanton St · Gala - Indigo Events VenueNov 14, 2025Tenant improvement for gala - indigo events venue — renovation/alteration — 6,272.50 s.f. banquet hall tenant improvement · 278 m away
- 220 South Stanton Street El Paso, TX 79901 · City Of El Paso CidAug 20, 2026220 south stanton st. renovation phase 1 — renovation/alteration — renovation of an existing building · 278 m away
- 101 N Stanton St · El Paso Electric CompanyFeb 26, 2026Epec stanton tower - 9th floor remodel — renovation/alteration — renovation/alteration of 21,000sf of office space within the 9th floor level of the stanton tower building · 375 m away
- 119 N. Stanton St · Sik Investments LLCDec 27, 2024Tenant improvement for smolder & brass — renovation/alteration — 1730 s.f. cigar shop tenant improvement · 434 m away
- 119 North Staton Street · Jmk5 International Building, LLCAug 14, 2026Renovation to the international building — renovation/alteration — renovate 80065 sq ft of an existing building for self storage space · 434 m away
- 100 N Stanton · El Paso Electric CompanyOct 1, 2025Stanton tower restroom additions — renovation/alteration — approx. 500sf remodel to add new restrooms · 443 m away
- 100 N. Stanton 10th · El Paso Electric Co.Jun 15, 2026Lawyer's office 10th floor tenant improvement — renovation/alteration — remodeling of existing law firm tenant space to downsize · 443 m away
- 100 N Stanton · El Paso Electric CompanyAug 26, 2026Epec stanton tower - 13th floor remodel — renovation/alteration — remodel of the 13th floor of stanton tower. construction includes gyp. bd. and metal stud partitions, new lay-in ceiling tiles, new storefront glass sections, new finishes · 443 m away
More demolitions in 79901.