601 East Overland Ave
El Paso, TX 79901 · County Of El Paso
Cabinet and countertop renovation at downtown detention facility
A 300-square-foot renovation for new cabinets and solid-surface countertops is registered at the downtown detention facility at 601 East Overland Ave. The TDLR project registration was filed November 26, 2025, and lists an estimated project cost of $136,000.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 26, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 26, 2025
- since Nov 26, 2025
- Largest scope
- 300 sf
- Estimated cost
- $136K
- state registration
Where this project stands
Finishing up · inspection nextNew Cabinets & Solid Surface Countertops at EPCDF UMC
300 sq ft · $136K est.
- RegisteredNov 26, 2025
- Plan review
- ConstructionJan '26 – Jul '26
- Inspectednow
- Closed
Scheduled to finish Jul 6, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectNew cabinets & solid surface countertops — downtown detention facility
TDLR project registrationRenovation/AlterationReview Complete300 sq ft$136K est.- Project #
- TABS2026006845
- Tenant / owner
- New Cabinets & Solid Surface Countertops At Epcdf Umc
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 601 East Overland Ave
What is being built at 601 East Overland Ave in El Paso?
A TDLR registration describes a 300-square-foot renovation for new cabinets and solid-surface countertops at a downtown detention facility. The project is listed as a renovation or alteration.
When was the project at 601 East Overland Ave filed?
The TDLR project registration, TABS2026006845, was filed on November 26, 2025. Its status is listed as Review Complete.
How much will the 601 East Overland Ave renovation cost?
The TDLR registration lists an estimated project cost of $136,000. This is the applicant's estimate, not a confirmed final cost.
How large is the cabinet and countertop project at 601 East Overland Ave?
The TDLR registration lists the project area as 300 square feet.
What's being renovated near 220 South Stanton Street in El Paso?
A cabinet and solid-surface countertop renovation is registered at 601 East Overland Ave, about 203 meters from 220 South Stanton Street. The registration was filed November 26, 2025.
Also being built nearby
All of 79901- 220 South Stanton Street El Paso, TX 79901 · City Of El Paso CidAug 20, 2026220 south stanton st. renovation phase 1 — renovation/alteration — renovation of an existing building · 203 m away
- 101 N Stanton St · El Paso Electric CompanyFeb 26, 2026Epec stanton tower - 9th floor remodel — renovation/alteration — renovation/alteration of 21,000sf of office space within the 9th floor level of the stanton tower building · 235 m away
- 100 N Stanton · El Paso Electric CompanyAug 26, 2026Epec stanton tower - 13th floor remodel — renovation/alteration — remodel of the 13th floor of stanton tower. construction includes gyp. bd. and metal stud partitions, new lay-in ceiling tiles, new storefront glass sections, new finishes · 266 m away
- 100 N. Stanton 10th · El Paso Electric Co.Jun 15, 2026Lawyer's office 10th floor tenant improvement — renovation/alteration — remodeling of existing law firm tenant space to downsize · 266 m away
- 100 N Stanton · El Paso Electric CompanyOct 1, 2025Stanton tower restroom additions — renovation/alteration — approx. 500sf remodel to add new restrooms · 266 m away
- 119 North Staton Street · Jmk5 International Building, LLCAug 14, 2026Renovation to the international building — renovation/alteration — renovate 80065 sq ft of an existing building for self storage space · 274 m away
- 119 N. Stanton St · Sik Investments LLCDec 27, 2024Tenant improvement for smolder & brass — renovation/alteration — 1730 s.f. cigar shop tenant improvement · 274 m away
- 501 Texas Ave · American Eagle Equity, Inc.Feb 11, 2026San carlos - tenant improvement — renovation/alteration — renovation of 1st level - restrooms, new parking space, and business suites, 2nd level - new office areas. basement -make into a new storage area to accommodate updated occupancy and egress configuration · 283 m away
- 304 E Overland Ave · Flor De Barro Art GalleryJul 6, 2026Flor de barro art gallery — renovation/alteration — renovation of an existing 3,354 sq ft commercial building for use as an art gallery on the ground floor with basement storage, including associated architectural, structural, mechanical, electrical, and plumbing modifications as required · 288 m away
- 221 N. Kansas Street · Mills Plaza Properties Vii, LPFeb 6, 2024Wf tax office imprvements — renovation/alteration — 768 sq ft alterations to existing lobby area by adding a security office station and replacing existing systems furniture with 6 secured millwork stations, exiting restrooms to be reconfigured to meet ada · 292 m away
- 221 N Kansas St · Franklin Mountain Property ServicesJul 7, 2025Wells fargo el paso admin and cash vault — renovation/alteration — two floors - interior renovation of existing space for new office. 9th floor - 4,965 sq ft lower level - 2,925 sq ft · 292 m away
- 211 S Mesa St · Mesa Bar And Club TiOct 23, 2024Mesa bar and club ti — renovation/alteration — two story building: 1st floor 2,200 sq ft, 2nd floor 4,850 sq ft · 315 m away