groundranger
Recent · latest filing Feb 2026Commercial

3411-A Sun Bowl Drive

El Paso, TX 79902 · University Of Texas El Paso

UTEP fourth-floor lab build-out planned at 3411-A Sun Bowl Drive

A 4,000-square-foot lab research space is planned for the fourth floor of an existing shell building at 3411-A Sun Bowl Drive. The Texas Department of Licensing and Regulation registration was filed February 24, 2026, and lists an applicant-estimated project cost of $5.7 million.

Summarized from Texas Department of Licensing and Regulation records · updated Feb 24, 2026

Projects
1
1 filings
Latest filing
Feb 24, 2026
since Feb 24, 2026
Largest scope
4,000 sf
Estimated cost
$5.7M
state registration

Where this project stands

Under construction

UTEP-IDRB - lvl 4 - Phase 2 Lab

4,000 sq ft · $5.7M est.

  1. RegisteredFeb 24, 2026
  2. Plan review
  3. ConstructionJun '26 – Apr '27
  4. Inspected
  5. Closed
54% through of a 10-month buildJun 15, 2026 → Apr 5, 2027

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Build-out of space on 4th floor of existing shell building into lab research space — utep - idrb

    TDLR project registrationAdditions to Existing BuildingReview Complete4,000 sq ft$5.7M est.
    Tenant / owner
    Utep-Idrb - Lvl 4 - Phase 2 Lab
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 3411-A Sun Bowl Drive

What is being built at 3411-A Sun Bowl Drive?

A 4,000-square-foot lab research space is planned on the fourth floor of an existing shell building. The TDLR registration identifies it as UTEP-IDRB - Level 4 - Phase 2 Lab.

Is UTEP building a lab at 3411-A Sun Bowl Drive?

A TDLR project registration describes a build-out into lab research space for UTEP-IDRB. It was filed February 24, 2026.

How large is the planned lab at 3411-A Sun Bowl Drive?

The TDLR registration lists the project at 4,000 square feet.

How much will the UTEP-IDRB lab project cost?

The TDLR registration lists an applicant-estimated cost of $5.7 million for the project.

When was the 3411-A Sun Bowl Drive lab project filed?

The TDLR project registration was filed February 24, 2026. Its registration number is TABS2026013353.

Also being built nearby

All of 79902
Email me when it passes inspection