500 W University Avenue
El Paso, TX 79902 · The University Of Texas At El Paso
UTEP Education Building data center renovation
A 4,568-square-foot renovation of the Education Building’s first floor is planned to accommodate a data center and related systems and equipment. The project was registered with TDLR on June 24, 2025, under project number TABS2025021913. The applicant’s estimated project cost is $3 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 24, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 24, 2025
- since Jun 24, 2025
- Largest scope
- 4,568 sf
- Estimated cost
- $3.0M
- state registration
Where this project stands
Finishing up · inspection nextEducation Building - Data Center
4,568 sq ft · $3.0M est.
- RegisteredJun 24, 2025
- Plan review
- ConstructionJul '25 – Jul '26
- Inspectednow
- Closed
Scheduled to finish Jul 31, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThis project involves improvements to the existing education building first floor to accommodate a data center and it's associated systems/equipment. — college of education building
TDLR project registrationRenovation/AlterationReview Complete4,568 sq ft$3.0M est.- Project #
- TABS2025021913
- Tenant / owner
- Education Building - Data Center
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 500 W University Avenue
What is being built at 500 W University Avenue in El Paso?
The project involves renovating the first floor of UTEP’s Education Building to accommodate a data center and its related systems and equipment. The TDLR registration describes 4,568 square feet of work.
Is UTEP building a new data center?
The registration describes improvements to the existing Education Building, not a new building. The work is intended to accommodate a data center and associated systems and equipment.
When was the Education Building data center project permitted?
The project was registered with the Texas Department of Licensing and Regulation on June 24, 2025. Its project number is TABS2025021913.
How much will the UTEP data center renovation cost?
The applicant’s estimated cost for the project is $3 million, according to the TDLR registration.
What is being built near the University of Texas at El Paso?
At 500 W University Avenue, the existing Education Building’s first floor is planned for renovation to accommodate a data center and related equipment. The TDLR filing was registered June 24, 2025.
Is the project at 500 W University Avenue a renovation or new construction?
It is listed as a renovation or alteration to the existing Education Building. The project covers 4,568 square feet.
Also being built nearby
All of 79902- 500 West University · The University Of Texas At El PasoMay 30, 2024Utep memorial gymmlocker room renovations — renovation/alteration — locker room renovations phassed construction
- 500 W Unversity · University Of Texas At El PasoSep 9, 2026Coba — renovation/alteration — renovation
- 2060 Hawthrone Street · University Of TexasJan 29, 2024Texas western hall - new building — new construction — approximately 125,000 gsf classroom building for the university of texas el paso including surrounding site improvements · 71 m away
- 2075 Hawthorne St · The University Of Texas At El PasoSep 24, 2025Utep physical sciences building - auditorium 115 — renovation/alteration — renovation of approximately 3113 gsf of an existing auditorium and adjacent circulation space · 80 m away
- 1991 Hawthorne Street · Board Of Regents Of The University Of Texas SystemJul 8, 2026Utep mining engineering renovation and metallurgy building deferred maintenance — additions to existing building — partial renovation of the existing metallurgy wing of the utep engineering complex (approximately 10,000 sq ft) to accommodate a new mining engineering program and update the metallurgy wing · 106 m away
- 2301 N Oregon St · Grace PointeSep 30, 2024Renovations for hospice @ grace pointe — renovation/alteration — interior office suite renovation · 348 m away
- 2001 N. Oregon · Tenet HealthcareJun 6, 2024Cath lab ahu replacement — renovation/alteration — the project scope includes the installation of a new air handler that will serve the cath lab, ir suite and support spaces. in three phases, the existing units will be removed, and the roof will be repaired. a new louver will also be installed · 392 m away
- 2001 N Oregon Street, El Paso, Texas 79902 · Tenet HealthcareApr 9, 2024Medgasfarm relocation — new construction — the project scope includes the relocation of the med gas farm. a structural concrete pad yard surrounded by cmu fence. chainlink fence gate access. a concrete drive and walk.new gas tanks. new piping inside young building. two new master alarm panel · 392 m away
- 2001 N Oregon Street · Tenet HealthcareAug 12, 2024Ir suite equipment replacement and renovations — renovation/alteration — the scope of this project consists of the replacement and upgrades to ir lab equipment, electrical, plumbing, and mechanical systems. new finishes and millwork are also part of the scope · 392 m away
- 2201 Sun Bowl Drive · The University Of Texas At El PasoJun 4, 2024Utep - interior renovations of bookstore — renovation/alteration — interior remodel of an existing bookstore, at the university of texas at el paso. the scope of work includes, but is not limited to partial remodeling, new paint, floor finishes, and systems furniture · 465 m away
- 2401 N Mesa St · Mcdonalds Usa , LLCMar 12, 2024Mcdonald's sid422246 nsn 27278 — renovation/alteration — • the kitchen and food prep area to remain “as is” • dining and restrooms to remain “as is” • install new customer service counter • new interior walls • replace existing brand and mccafe walls • new electrical power for new food order kiosks and dig · 476 m away
- 1801 N. Oregon St · Las Palmas Medical CenterMar 2, 2025Voluntary accessibility upgrade — renovation/alteration — renovation for accessibility of 4 patient bedroom bathrooms as well as 2 multi-stall public toilets and 2 single use public toilets · 522 m away