910 W University Ave Level 04
El Paso, TX 79902 · University Of Texas El Paso
UTEP Level 04 research building office buildout
A 10,000-square-foot buildout is planned for shell space on Level 04 of UTEP’s Interdisciplinary Research Building, including an office suite and restrooms. The project was registered with TDLR on March 13, 2025, with an applicant-estimated cost of $4 million. Its listed status is Inspection Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 13, 2025
- since Mar 13, 2025
- Largest scope
- 10,000 sf
- Estimated cost
- $4.0M
- state registration
Where this project stands
Inspected · closing outUTEP-IDRB - Level 04 Research Buildout
10,000 sq ft · $4.0M est.
- RegisteredMar 13, 2025
- Plan review
- ConstructionJun '25 – Mar '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectBuildout of shell space in existing building. scope includes office suite and restrooms — utep interdisciplinary research building
TDLR project registrationRenovation/AlterationInspection Complete10,000 sq ft$4.0M est.- Project #
- TABS2025014097
- Tenant / owner
- Utep-Idrb - Level 04 Research Buildout
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 910 W University Ave Level 04
What is being built at 910 W University Ave in El Paso?
A 10,000-square-foot buildout of shell space on Level 04 of UTEP’s Interdisciplinary Research Building, including an office suite and restrooms. TDLR registration TABS2025014097 was filed March 13, 2025.
Is UTEP building a new research building at 910 W University Ave?
The TDLR record describes renovation and alteration of shell space in an existing building, not construction of a new building. The work is on Level 04 of UTEP’s Interdisciplinary Research Building.
What is the estimated cost of the UTEP Level 04 buildout?
The TDLR registration lists an applicant-estimated project cost of $4 million. The estimate is for the project described in registration TABS2025014097.
How large is the UTEP research building buildout?
The registered project covers 10,000 square feet of shell space on Level 04. Its scope includes an office suite and restrooms.
When was the UTEP Level 04 project filed?
The project was registered with TDLR on March 13, 2025. The record lists its status as Inspection Complete.
What is being renovated near El Paso Independent School District at 800 E Schuster Ave?
The UTEP Interdisciplinary Research Building is about 514 meters from the El Paso Independent School District address listed at 800 E Schuster Ave. Its Level 04 registration describes a 10,000-square-foot office and restroom buildout.
Also being built nearby
All of 79902More offices in 79902.