6101 Gateway Blvd. W. Space 332,335,340
El Paso, TX 79925 · Bassett Place Real Estate Co. LLC
Three retail spaces to become a restaurant at Bassett Place
A TDLR registration describes renovating three existing retail spaces at 6101 Gateway Blvd. W., Spaces 332, 335 and 340, into one restaurant named UMIYA. The 10,800-square-foot project was registered on October 21, 2026, with an applicant-estimated project cost of $800,000.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 21, 2026
- since Oct 21, 2026
- Largest scope
- 10,800 sf
- Estimated cost
- $800K
- state registration
Where this project stands
In state plan reviewUMIYA
10,800 sq ft · $800K est.
- RegisteredOct 21, 2026
- Plan reviewnow
- ConstructionDec '26 – Sep '27
- Inspected
- Closed
Construction is scheduled to start Dec 1, 2026. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectRenovation of three existing retail stores into one restaurant. — bassett place
TDLR project registrationRenovation/AlterationProject Registered10,800 sq ft$800K est.- Project #
- TABS2027004120
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 6101 Gateway Blvd. W. Space 332,335,340
What is being built at 6101 Gateway Blvd. W. in El Paso?
A TDLR project registration describes renovating three existing retail spaces into one restaurant named UMIYA. The project is listed as 10,800 square feet.
When was the UMIYA project registered?
The project was registered with the Texas Department of Licensing and Regulation on October 21, 2026. Its registration number is TABS2027004120.
What spaces are included in the restaurant renovation?
The registration lists Spaces 332, 335 and 340 at 6101 Gateway Blvd. W., El Paso, TX 79925.
How much will the UMIYA project cost?
The applicant estimated the project cost at $800,000. This is an estimate for the project, not a reported final cost.
What's being built near Target on West Gateway Boulevard?
Three existing retail spaces at 6101 Gateway Blvd. W. are planned for renovation into one restaurant named UMIYA. The registration places the project about 198 meters from Target El Paso TX T0849 at 6001 W Gateway Blvd.
When will the restaurant open in El Paso?
The TDLR registration does not list an opening date.
Also being built nearby
All of 79925- 6101 Gateway Blvd · Bassett Place Real Estate Company, LLCNov 11, 2025Spectrum — renovation/alteration — tenant improvement for 3,100 sq ft existing facility to become a spectrum
- 6101 Gateway Blvd. West · Bassett Place Real Estate Co. LLCMar 11, 2025Burlington el paso — renovation/alteration — existing 47,005sf ti, interior non structural demolition. new partition walls, ceilings, walls and floor finishes. new lighting, power, drinking fountain, plumbing fixtures and hvac
- 6175 Gateway Blvd · Wells Fargo Bank, NaDec 17, 2024Wells fargo - bassett — renovation/alteration — reduce number of workstations, teller stations, new accessibile teller station, new interior finishes & furniture replacement · 145 m away
- 6001 W Gateway Blvd · Bassett Place Real Estate Company LLCNov 7, 2025Target el paso tx t0849 — renovation/alteration — renovation of existing target store · 198 m away
- 6044 Gateway Blvd. East · 6044 Gateway East, LLCOct 23, 2024Las espadas restaurant t.i. — renovation/alteration — building interior new restaurant tenant improvement · 256 m away
- 6201 Edgemere Blvd · Goldtex Partners, LLCMar 30, 2026Nusenda credit union - edgemere branch — new construction — this project is a new construction stand alone facility for nusenda credit union which will house spaces that support banking functions · 294 m away
- 6250 Edgemere Blvd · Bassett VillageDec 16, 2024Office tenant improvements — renovation/alteration — tenant improvements within existing building · 407 m away