groundranger
Historic · latest filing Mar 2024Commercial

8301 Edgemere Boulevard

El Paso, TX 79925 · City Of El Paso

Renovations registered for El Paso Fire Station No. 20

Renovations to the City of El Paso’s Fire Station No. 20 at 8301 Edgemere Boulevard were registered with TDLR on March 24, 2024. The 7,400-square-foot project includes replacement of mechanical systems, most plumbing and electrical fixtures, roof recoating, and cosmetic work; the applicant’s estimated project cost is $826,660.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 24, 2024

Projects
1
1 filings
Latest filing
Mar 24, 2024
since Mar 24, 2024
Largest scope
7,400 sf
Estimated cost
$827K
state registration

Where this project stands

Inspected · closing out

Fire Station No. 20 - RENOVATIONS

7,400 sq ft · $827K est.

  1. RegisteredMar 24, 2024
  2. Plan review
  3. ConstructionApr '24 – Mar '25
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Level 1 alteration includes a one-to-one replacement of mechanical systems, most plumbing, and electrical fixtures both inside and outside the facility. additionally, the project will encompass roof recoating and cosmetic enhancements such as new p — fire station no. 20

    TDLR project registrationRenovation/AlterationInspection Complete7,400 sq ft$827K est.
    Tenant / owner
    Fire Station No. 20 - Renovations
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 8301 Edgemere Boulevard

What is being built at 8301 Edgemere Boulevard?

The project is a renovation of the City of El Paso’s Fire Station No. 20, not a new building. The TDLR registration describes mechanical, plumbing and electrical replacements, roof recoating, and cosmetic work.

When was the Fire Station No. 20 renovation registered?

The project was registered with the Texas Department of Licensing and Regulation on March 24, 2024. Its TDLR project number is TABS2024014526.

What work is planned at El Paso Fire Station No. 20?

The registration describes a one-to-one replacement of mechanical systems, most plumbing, and electrical fixtures inside and outside the facility, along with roof recoating and cosmetic enhancements.

How much will the Fire Station No. 20 renovation cost?

The applicant’s estimated cost for the project is $826,660, according to the TDLR registration. This is an estimate, not a confirmed final cost.

Is the Fire Station No. 20 renovation complete?

The TDLR record lists the project status as “Inspection Complete.” The registration was filed on March 24, 2024.

Email me when the project is closed