12304 N Eastlake Blvd
El Paso, TX 79928 · Ga Eastlake LLC
Panera #6404 restaurant build-out registered in El Paso
A 3,500-square-foot Panera restaurant interior build-out is planned at 12304 N Eastlake Blvd in El Paso. The TDLR project registration was filed October 30, 2024, and lists an applicant-estimated project cost of $825,000.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 30, 2024
- since Oct 30, 2024
- Largest scope
- 3,500 sf
- Estimated cost
- $825K
- state registration
Where this project stands
Inspected · closing outPANERA #6404
3,500 sq ft · $825K est.
- RegisteredOct 30, 2024
- Plan review
- ConstructionJan '25 – Mar '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectTenant interior build out for a restaurant — eastlake plaza
TDLR project registrationRenovation/AlterationInspection Complete3,500 sq ft$825K est.- Project #
- TABS2025004448
- Tenant / owner
- Panera #6404
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 12304 N Eastlake Blvd
What is being built at 12304 N Eastlake Blvd?
A 3,500-square-foot interior build-out for Panera #6404 is listed at the address. The TDLR registration, TABS2025004448, was filed October 30, 2024.
Is a Panera opening at 12304 N Eastlake Blvd?
The TDLR record describes a tenant interior build-out for a restaurant named Panera #6404. It does not provide an opening date.
How large is the Panera project in El Paso?
The project registration lists 3,500 square feet for the restaurant interior build-out.
How much is the Panera project estimated to cost?
The applicant’s estimate in the TDLR registration is $825,000. This is an estimate, not a confirmed final project cost.
What is being built near Drunken Crab Seafood Bar on Eastlake?
A Panera restaurant interior build-out is registered at 12304 N Eastlake Blvd, about 377 meters from Drunken Crab Seafood Bar at 12261 Eastlake. The Panera project was filed with TDLR on October 30, 2024.
Is the Panera project at 12304 N Eastlake Blvd complete?
The TDLR record lists the project status as “Inspection Complete.” It does not give a construction completion or restaurant opening date.
Also being built nearby
All of 79928- 12304 Eastlake Blvd · Ga Eastlake LLCJul 17, 2025Interior tenant improvement - verizon — renovation/alteration — interior build out from landlord provided dark box commercial retail building to a new cellular phone retail space
- 12220 Eastlake Blvd · Heights Properties LlpDec 11, 20257brew coffee shop (eastlake blvd) — new construction — new 510sqft drive-thru only coffee shop with dual drive lanes and associated parking, utility and landscape construction · 78 m away
- 13431 Gateway West · Halle Properties LLCApr 23, 2025Discount tire centers — new construction — new building construction (9,377 sq ft) and site improvements · 297 m away
- 13461 Gateway Blvd. West · Krupalu, Inc.May 19, 2026Homewood suites by hilton el paso east — new construction — 4 story, 89,565 sq ft new hotel construction with site and landscape works · 334 m away
- 12261 Eastlake · Drunken Crab Seafood BarNov 18, 2024Tenant improvement for drunken crab t.i. — renovation/alteration — metal stud's interior renovations for a seafood restaurant · 377 m away
- 12261 Eastlake Boulevard · Rop Eastlake Commons LtdNov 21, 2024Umc eastlake commons urgent care clinic — new construction — new tenant improvement of approximately 4,200 s.f. to serve as an urgent care clinic for umc within an existing empty shell building owned by river oaks properties · 377 m away
- 12261 Eastlake Blvd · Rop Eastlake Commons, LtdJun 5, 2026Tesolife — renovation/alteration — tenant improvement · 377 m away
- 13491 Gteway Boulevard West · Del Rio Hospitality LLCJan 27, 2025Residence inn east el paso — new construction — construct a 4-story, 120 room, aprox. 78,000 sq ft residence inn hotel from the gound up · 385 m away
- 10300 Gateway East Blvd · Qt South, LLCOct 17, 2025Quiktrip # 7909 fryer project — renovation/alteration — includes re-organization of existing kitchen equipment and addition of new fryer units. project 300 sq ft · 516 m away
- 12316 East Lake Blvd · Br El Paso LLCSep 23, 2024Valvoline instant oil change — new construction — new construction 3763 sq ft valvoline with lube pit · 554 m away
- 10400 Gateway Blvd East · Urgent CareFeb 18, 2025Urgent care — new construction — new construction of medical office & new construction of shell building. building. 1 (4,800 sq ft) building. 2 (13,804 sq ft) · 576 m away
- 12320 Eastlake Blvd · 12320 Eastlake LLCSep 5, 2024Nusenda credit union - eastlake branch — renovation/alteration — interior build out on an existing shell space located at 12320 eastlake blvd, in el paso county, texas. the scope of work includes, but is not limited to new office and support spaces for banking and administrative operations · 578 m away
More restaurants in 79928.