11330 Montwood Dr
El Paso, TX 79936 · Jb3 Properties, LP
Burlington plans interior improvements at Montwood Square
A 28,345-square-foot existing space for Burlington is slated for interior tenant improvements at Montwood Square in El Paso. The Texas Department of Licensing and Regulation registered the project on July 16, 2026; the applicant’s estimated project cost is $1.4 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 16, 2026
- since Jul 16, 2026
- Largest scope
- 28,345 sf
- Estimated cost
- $1.4M
- state registration
Where this project stands
In state plan reviewBurlington - El Paso - Montwood
28,345 sq ft · $1.4M est.
- RegisteredJul 16, 2026
- Plan reviewnow
- ConstructionNov '26 – Apr '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectInterior tenant improvement of existing space — montwood square
TDLR project registrationRenovation/AlterationProject Registered28,345 sq ft$1.4M est.- Project #
- TABS2026025421
- Tenant / owner
- Burlington - El Paso - Montwood
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 11330 Montwood Dr
What is being built at 11330 Montwood Drive?
A TDLR registration describes interior tenant improvements to an existing 28,345-square-foot space for Burlington. It does not describe a new building.
Is Burlington opening at Montwood Square?
The July 16, 2026, registration lists Burlington and describes improvements to an existing space. It does not provide an opening date.
How much will the Burlington project at 11330 Montwood Drive cost?
The applicant’s estimated cost for the project is $1.4 million, according to TDLR registration TABS2026025421.
When was the Burlington Montwood project registered?
The Texas Department of Licensing and Regulation registered it on July 16, 2026, under project number TABS2026025421.
What is being built near Target on George Dieter Drive?
At 11330 Montwood Drive, about 309 meters from Target at 1901 George Dieter Drive, a registered project calls for interior improvements to an existing Burlington space.
Is the work at 11330 Montwood Drive a renovation or new construction?
The TDLR record classifies the work as a renovation or alteration and describes interior tenant improvements to an existing space.
Also being built nearby
All of 79936- 11330 Montwood Drive · Jb3 Properties LPJun 24, 2026Burlington lease improvements — renovation/alteration — interior demotion of existing space, along with new exterior entry facade and rear loading dock appendage
- 1881 George Dieter-Suite B · Ck Border Investments #1, LLCJul 15, 2024George dieter & montwood dr. — new construction — new construction · 307 m away
- 1901 George Dieter Drive · TargetSep 1, 2026Target el paso tx t0823 — renovation/alteration — interior remodel including the sales floor, fitting rooms and restrooms · 309 m away
- 1830 George Dieter · River Oaks Properties, Ltd.Aug 11, 2026El compita del ceviche — renovation/alteration — interior renovation of an existing commercial tenant space for a new seafood restaurant. work includes interior demolition, new partitions, plumbing, electrical work, commercial kitchen installation, interior finishes, and ada|tas compliant iprovemen · 360 m away
- 135152/3 Greenlow DrApr 26, 2024Cell tower replacement of antennas & equip · 416 m away
- 3037 Trawood DriveJun 12, 2026Gecu trawood — new construction — new credit union branch with drive up · 471 m away