28527 I-35
Encinal, TX 78019 · Love's Travel Stops & Country Stores Inc.
Love’s EV charging station project registered in Encinal
A TDLR registration describes installation of two dual electric vehicle charging stations, four powerblock modules and electrical switchgear at 28527 I-35 in Encinal. The project was registered on March 25, 2025, with an estimated cost of $600,000.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 25, 2025
- since Mar 25, 2025
- Largest scope
- 1,600 sf
- Estimated cost
- $600K
- state registration
Where this project stands
CompletedLove's 298 EV Charging Staton
1,600 sq ft · $600K est.
- RegisteredMar 25, 2025
- Plan review
- ConstructionMay '25 – Aug '25
- Inspected
- Closed
Ran as a 3-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInstallation of two dual electric vehicle charging stations, four powerblock modules, one 2000a electrical switchgear — loves travel stops & country stores
TDLR project registrationRenovation/AlterationProject Closed1,600 sq ft$600K est.- Project #
- TABS2025015011
- Tenant / owner
- Love's 298 Ev Charging Staton
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 28527 I-35
What is being built at 28527 I-35 in Encinal?
A TDLR project registration describes two dual electric vehicle charging stations, four powerblock modules and one 2000-amp electrical switchgear at the address. The record names Love’s Travel Stops & Country Stores Inc.
Is Love’s adding EV chargers in Encinal?
A project registered on March 25, 2025, describes installation of two dual electric vehicle charging stations at 28527 I-35.
When was the Love’s EV charging project registered?
The TDLR registration was filed on March 25, 2025. Its project number is TABS2025015011.
How much will the Love’s EV charging project cost?
The TDLR record lists an estimated project cost of $600,000. This is the applicant’s estimate, not a confirmed final cost.
Is the EV charging project at 28527 I-35 complete?
The TDLR record lists the project status as “Project Closed.” The registration does not confirm whether installation is complete.
How many EV charging stations are planned at Love’s in Encinal?
The project description lists two dual electric vehicle charging stations, along with four powerblock modules and one 2000-amp electrical switchgear.