groundranger
Recent · latest filing Apr 2026Commercial

4751 Flower Mound Road

Flower Mound, TX 75022 · Post Oak Park

Post Oak Park to Get Restroom, Trail and Playground Upgrades

Post Oak Park improvements include a premanufactured restroom building with two family stalls, replacement play equipment and fall surfacing, and concrete trails. The project was registered with TDLR on April 14, 2026, under project number TABS2026017610. The applicant’s estimated project cost is $1,127,313.

Summarized from Texas Department of Licensing and Regulation records · updated Apr 14, 2026

Projects
1
1 filings
Latest filing
Apr 14, 2026
since Apr 14, 2026
Largest scope
116 sf
Estimated cost
$1.1M
state registration

Where this project stands

Under construction

Post Oak Park Improvements

116 sq ft · $1.1M est.

  1. RegisteredApr 14, 2026
  2. Plan review
  3. ConstructionJun '26 – Jun '27
  4. Inspected
  5. Closed
44% through of a 13-month buildJun 1, 2026 → Jun 30, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. New premanufactured restroom building with 2 family stalls, replace existing play equipment & fall surfacing, replace existing gravel trails with concrete trails, grading & drainage improvements to pond inflow & outlet, pedestrian crossing. — post oak park

    TDLR project registrationNew ConstructionReview Complete116 sq ft$1.1M est.
    Tenant / owner
    Post Oak Park Improvements
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 4751 Flower Mound Road

What is being built at 4751 Flower Mound Road?

Post Oak Park improvements include a premanufactured restroom building with two family stalls. The project also includes replacement play equipment and fall surfacing, concrete trails, pond drainage work, and a pedestrian crossing.

Is Post Oak Park getting a new restroom?

Yes. The TDLR registration describes a premanufactured restroom building with two family stalls. It was filed April 14, 2026, as project TABS2026017610.

Are the trails at Post Oak Park being replaced?

The project description says existing gravel trails will be replaced with concrete trails.

Is the playground at Post Oak Park being renovated?

The registered project includes replacing existing play equipment and fall surfacing.

What drainage work is planned at Post Oak Park?

The project description includes grading and drainage improvements to the pond inflow and outlet.

How much will the Post Oak Park improvements cost?

The applicant’s estimated cost for the project is $1,127,313, according to the TDLR registration filed April 14, 2026.

Email me when it passes inspection