609 Enterprise Dr
Flower Mound, TX 75028 · Flower Mound Ddc
Warehouse facility remodel at 609 Enterprise Dr
A warehouse facility remodel was registered with the Texas Department of Licensing and Regulation on April 10, 2024. The 3,947-square-foot work area includes replacement loading docks, a restroom and office addition, and a guard shack remodel. The applicant's estimated project cost is $1.2 million.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 10, 2024
- since Apr 10, 2024
- Largest scope
- 3,947 sf
- Estimated cost
- $1.2M
- state registration
Where this project stands
Finishing up · inspection nextBest Buy #0075 Flower Mound, TX - Interior Remodel
3,947 sq ft · $1.2M est.
- RegisteredApr 10, 2024
- Plan review
- ConstructionMay '24 – Jul '24
- Inspectednow
- Closed
Scheduled to finish Jul 15, 2024; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectPartial remodel of warehouse facility. replacement of several loading docks, addit5ion of restroom/office, guard shack remodel. work area: 3,947sf — flower mound ddc
TDLR project registrationRenovation/AlterationReview Complete3,947 sq ft$1.2M est.- Project #
- TABS2024015804
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 609 Enterprise Dr
What is being built at 609 Enterprise Dr in Flower Mound?
A TDLR registration describes a partial remodel of a warehouse facility, including loading dock replacements, a restroom and office addition, and a guard shack remodel.
When was the 609 Enterprise Dr project registered?
The project was registered on April 10, 2024. Its TDLR record, TABS2024015804, has a status of Review Complete.
How large is the warehouse remodel at 609 Enterprise Dr?
The listed work area is 3,947 square feet.
How much will the 609 Enterprise Dr remodel cost?
The applicant's estimated cost for the project is $1.2 million.
What's being remodeled near Smiles And Beyond in Flower Mound?
A warehouse facility at 609 Enterprise Dr is slated for a partial remodel. Smiles And Beyond is listed about 402 meters away.
Is new construction planned near Racetrac Petroleum on Grapevine Mills?
The record for 609 Enterprise Dr describes a warehouse remodel, not new construction. Racetrac Petroleum at 3955 Grapevine Mills is listed about 539 meters away.
Also being built nearby
All of 75028- 250 Gerault Rd · Smiles And BeyondMar 12, 2025Smiles and beyond — new construction — we're finishing out a dentist's office, adding walls, flooring, plumbing, electrical, hvac, and ada features. installing dental equipment and ensuring code compliance for a functional, professional space · 402 m away
- 250 Gerault Road · Southgate Nec Lot 2 BuildingMar 25, 2026Office suite 145 — renovation/alteration — finish out for office suite · 402 m away
- 3955 Grapevine Mills · Racetrac Petroleum, Inc.May 31, 2024Rt#1065 grapevine mills edo & restroom addition — renovation/alteration — relocation of existing equipment, incorporation of new equipment, incorporation of electrical panel equipment and design to accommodate extended diesel option, provide fuel canopy and men's restroom updates · 539 m away