15217 Grand River Rd., Fort Worth, TX 76155
Fort Worth, TX 76102 · City Of Fort Worth
CentrePort Trail Phase 2 path planned in Fort Worth
A 12-foot-wide shared-use path, pedestrian bridge, retaining walls, storm pipes and driveway replacement are planned for CentrePort Trail Phase 2 in Fort Worth. The City of Fort Worth project was registered with TDLR on December 18, 2024; the applicant’s estimated project cost is $13,339,362.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 18, 2024
- since Dec 18, 2024
- Largest scope
- 85,000 sf
- Estimated cost
- $13M
- state registration
Where this project stands
Under constructionCentrePort Trail Phase 2 Fort Worth
85,000 sq ft · $13M est.
- RegisteredDec 18, 2024
- Plan review
- ConstructionMar '26 – Mar '27
- Inspected
- Closed
4 contacts on this project · 2 phone numbers
Permit & project history
1 project12' wide shared use path including a pedestrian bridge, retaining walls, storm pipes, and driveway replacement — centreport trail
TDLR project registrationNew ConstructionReview Complete85,000 sq ft$13M est.- Project #
- TABS2025008038
- Tenant / owner
- Centreport Trail Phase 2 Fort Worth
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 15217 Grand River Rd., Fort Worth, TX 76155
What is being built at 15217 Grand River Road in Fort Worth?
A TDLR registration describes CentrePort Trail Phase 2: a 12-foot-wide shared-use path with a pedestrian bridge, retaining walls, storm pipes and driveway replacement. The registration was filed December 18, 2024.
Is CentrePort Trail Phase 2 a new construction project?
The TDLR registration classifies CentrePort Trail Phase 2 as new construction. Its status is listed as Review Complete.
Who is listed for the CentrePort Trail Phase 2 project?
The project record lists the City of Fort Worth as the occupant or owner.
How much is the CentrePort Trail Phase 2 project estimated to cost?
The TDLR registration lists an estimated project cost of $13,339,362. This is the applicant’s estimate, not a confirmed final cost.
What is being planned near Cummings Electrical on Grand River Road?
About 422 meters from Cummings Electrical, the CentrePort Trail Phase 2 project is registered for a shared-use path, pedestrian bridge, retaining walls, storm pipes and driveway replacement.
When was CentrePort Trail Phase 2 registered?
The TDLR project registration, TABS2025008038, was filed on December 18, 2024.
Also being built nearby
All of 76102- 14900 Grand River Rd · Cummings ElectricalAug 22, 2024Cummings electrical office renovation — renovation/alteration — 26,250 sq ft renovation of existing office, adding conference rooms, additional bathroom facilities, and open work spaces · 422 m away
- 14800 Frye Rd · Jp Centre (tx) LLCOct 15, 2025Jpmc cash vault — renovation/alteration — tenant improvement - demolition, new finishes, new camera · 576 m away