groundranger
Historic · latest filing Dec 2024Commercial

15217 Grand River Rd., Fort Worth, TX 76155

Fort Worth, TX 76102 · City Of Fort Worth

CentrePort Trail Phase 2 path planned in Fort Worth

A 12-foot-wide shared-use path, pedestrian bridge, retaining walls, storm pipes and driveway replacement are planned for CentrePort Trail Phase 2 in Fort Worth. The City of Fort Worth project was registered with TDLR on December 18, 2024; the applicant’s estimated project cost is $13,339,362.

Summarized from Texas Department of Licensing and Regulation records · updated Dec 18, 2024

Projects
1
1 filings
Latest filing
Dec 18, 2024
since Dec 18, 2024
Largest scope
85,000 sf
Estimated cost
$13M
state registration

Where this project stands

Under construction

CentrePort Trail Phase 2 Fort Worth

85,000 sq ft · $13M est.

  1. RegisteredDec 18, 2024
  2. Plan review
  3. ConstructionMar '26 – Mar '27
  4. Inspected
  5. Closed
72% through of a 12-month buildMar 1, 2026 → Mar 1, 2027

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. 12' wide shared use path including a pedestrian bridge, retaining walls, storm pipes, and driveway replacement — centreport trail

    TDLR project registrationNew ConstructionReview Complete85,000 sq ft$13M est.
    Tenant / owner
    Centreport Trail Phase 2 Fort Worth
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 15217 Grand River Rd., Fort Worth, TX 76155

What is being built at 15217 Grand River Road in Fort Worth?

A TDLR registration describes CentrePort Trail Phase 2: a 12-foot-wide shared-use path with a pedestrian bridge, retaining walls, storm pipes and driveway replacement. The registration was filed December 18, 2024.

Is CentrePort Trail Phase 2 a new construction project?

The TDLR registration classifies CentrePort Trail Phase 2 as new construction. Its status is listed as Review Complete.

Who is listed for the CentrePort Trail Phase 2 project?

The project record lists the City of Fort Worth as the occupant or owner.

How much is the CentrePort Trail Phase 2 project estimated to cost?

The TDLR registration lists an estimated project cost of $13,339,362. This is the applicant’s estimate, not a confirmed final cost.

What is being planned near Cummings Electrical on Grand River Road?

About 422 meters from Cummings Electrical, the CentrePort Trail Phase 2 project is registered for a shared-use path, pedestrian bridge, retaining walls, storm pipes and driveway replacement.

When was CentrePort Trail Phase 2 registered?

The TDLR project registration, TABS2025008038, was filed on December 18, 2024.

Also being built nearby

All of 76102
Email me when it passes inspection