400 Houston St 407 Throckmorton St
Fort Worth, TX 76102 · Cassidy Block LLC
Chiropractic and wellness office planned at 400 Houston St
A 7,845-square-foot interior build-out for a chiropractic and wellness office was registered on March 5, 2026, at 400 Houston St / 407 Throckmorton St. The plans call for treatment rooms, offices and a pantry on the third floor of a space described as never previously occupied by a tenant. The applicant estimated the project cost at $700,000.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 5, 2026
- since Mar 5, 2026
- Largest scope
- 7,845 sf
- Estimated cost
- $700K
- state registration
Where this project stands
Finishing up · inspection nextCassidy Wellness Office
7,845 sq ft · $700K est.
- RegisteredMar 5, 2026
- Plan review
- ConstructionApr '26 – May '26
- Inspectednow
- Closed
Scheduled to finish May 29, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectNew interior build-out of commercial space for chiropractic and wellness office on the third floor. the space has never been occupied by a tenant. create treatment rooms, offices, pantry. maintains all existing means of egress. — cassidy block
TDLR project registrationRenovation/AlterationReview Complete7,845 sq ft$700K est.- Project #
- TABS2026014298
- Tenant / owner
- Cassidy Wellness Office
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 400 Houston St 407 Throckmorton St
What is being built at 400 Houston St in Fort Worth?
A third-floor interior build-out for Cassidy Wellness Office, a chiropractic and wellness office. The plans include treatment rooms, offices and a pantry.
When was the Cassidy Wellness Office project filed?
The project was registered with the Texas Department of Licensing and Regulation on March 5, 2026. Its registration number is TABS2026014298.
How large is the Cassidy Wellness Office build-out?
The registered project covers 7,845 square feet, according to TDLR.
How much will the Cassidy Wellness Office project cost?
The applicant estimated the project cost at $700,000 in the TDLR registration. This is an estimate, not a confirmed final cost.
Is a new wellness office going in near Curfew Bar?
A chiropractic and wellness office build-out is planned at 400 Houston St / 407 Throckmorton St, about 184 meters from Curfew Bar at 611 Houston Street. The TDLR registration was filed March 5, 2026.
What is planned near Plummer Associates on Throckmorton Street?
Cassidy Wellness Office is planning a third-floor interior build-out at 400 Houston St / 407 Throckmorton St, about 88 meters from Plummer Associates at 300 Throckmorton St. The plans include treatment rooms, offices and a pantry.
Also being built nearby
All of 76102- 300 Throckmorton · One CityplaceOct 11, 2024Duane morris ft worth — renovation/alteration — interior remodel, no change of use · 88 m away
- 300 Throckmorton Street · Srep-Ocpfwtx,llcApr 14, 2025Winstead law fort worth — renovation/alteration — law office refresh/renovation · 88 m away
- 300 Throckmorton St · One City PlaceAug 4, 2026Plummer associates, inc. — renovation/alteration — non-structural interior finish-out in an existing single floor suite · 88 m away
- 570 Throckmorton St · Polanco - The Tower FwOct 29, 2024Polanco — renovation/alteration — interior remodel for restaurant · 120 m away
- 500 Taylor Street · Sada CapitalJan 31, 2024500 taylor street parking garage remodel — renovation/alteration — the remodel of the first and second floor parking garage lobbies as well as new exterior paint and light fixtures · 123 m away
- 512 Main Street · Sinclair Holdings, LLCDec 17, 2024Sinclair hotel hvac upgrade — renovation/alteration — expand the existing elevated hvac equipment platform and relocated existing air conditioning equipment to platform expansion · 178 m away
- 611 Houston Street · Msp 611 Houston Partner, LPAug 10, 2026Curfew bar — renovation/alteration — interior finish-out of existing basement lease space. existing and new mechanical, electrical and plumbing equipment · 184 m away
- 124 East 4th St · Cotulla LPMay 25, 2026La dolce vita, gelateria italiana — renovation/alteration — tenant improvement, equipment replacement, maintenance of the existing layout, addition of a pos station at the entrance, and existing restrooms to remain unchanged. 1448 sq ft · 203 m away
- 640 Taylor St · Antracite Realty Partners LLCOct 7, 2024Hntb forth worth expansion (39-24143-00) — renovation/alteration — new non load bearing walls, ceilings, finishes, furnishings, millwork and lighting; no change of use area, occupancy, or parking. no exterior work · 206 m away
- 640 Taylor Street · 640 Taylor LPOct 2, 2026Tenaska finish-out at frost tower — renovation/alteration — first generation office finish-out, approx. 4629 sq ft · 206 m away
- 210 Main Street · City Center Mgmt. Co,;srb City Invst. Lp.;ddr/Dtc City Invst; City Invst. Lp.Oct 1, 2024Offices for summittx — renovation/alteration — remodel of existing lease space · 229 m away
- 201 Main Street · City Center Development Co Lp; Srb City Invst Lp;ddr/Dtc City Invst;city Invst LPAug 26, 2026Remodel for bepco level 27 — renovation/alteration — remodel of existing office space · 243 m away
More offices in 76102.