251 W. Peter Smith St
Fort Worth, TX 76104 · Ojala Holdings
The Bonnie Phase 1: 253 apartments planned
The Bonnie Phase 1 is a registered new-construction project for 253 apartments in four-story wood-frame buildings, with a precast concrete garage, two courtyards and a pool at 251 W. Peter Smith St. The project was registered with TDLR on June 24, 2025 (TABS2025021976). The applicant estimates the project cost at $60 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 24, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 24, 2025
- since Jun 24, 2025
- Largest scope
- 364,945 sf
- Estimated cost
- $60M
- state registration
Where this project stands
Under constructionThe Bonnie Phase 1
364,945 sq ft · $60M est.
- RegisteredJun 24, 2025
- Plan review
- ConstructionJun '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 project253 apartment units in 4-story wood frame apartment buildings with a precast concrete garage. 2 courtyards with a pool, club, leasing, mail, co-working and amenity areas. — n/a
TDLR project registrationNew ConstructionReview Complete364,945 sq ft$60M est.- Project #
- TABS2025021976
- Tenant / owner
- The Bonnie Phase 1
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 251 W. Peter Smith St
What is being built at 251 W. Peter Smith St. in Fort Worth?
The Bonnie Phase 1 is a planned 253-unit apartment project with four-story wood-frame buildings and a precast concrete garage. Its TDLR registration was filed June 24, 2025, under project number TABS2025021976.
How many apartments are planned for The Bonnie Phase 1?
The project description lists 253 apartment units. It was registered with TDLR on June 24, 2025.
What amenities are listed for The Bonnie Phase 1?
The project description lists two courtyards, a pool, club, leasing and mail areas, co-working space and other amenity areas. The TDLR registration was filed June 24, 2025.
How much will The Bonnie Phase 1 cost?
The applicant estimated the project cost at $60 million in its TDLR registration, filed June 24, 2025. This is an estimate, not a confirmed final cost.
What is being built near Outpost Fort Worth on Cleveland Avenue?
The Bonnie Phase 1, a 253-unit apartment project, is listed at 251 W. Peter Smith St., about 106 meters from Outpost Fort Worth at 454 Cleveland Ave. Its TDLR registration was filed June 24, 2025.
Is an apartment project planned near Broadway Baptist Church in Fort Worth?
The Bonnie Phase 1 is planned at 251 W. Peter Smith St., about 133 meters from Broadway Baptist Church. The 253-unit project was registered with TDLR on June 24, 2025.
Also being built nearby
All of 76104- 454 Cleveland Ave, Fort Worth, TX 76104 · Outpost Fort Worth, LLCJun 6, 2025Soma cfa - lot 1r, block 3 sprinkle's addition — renovation/alteration — water, sewer, paving & street light improvements · 106 m away
- 454 Cleveland · Somaca Casitas, LPSep 10, 2024Soma outpost casitas — new construction — tiny home apartment facility intended for short term hospitality occupancy · 106 m away
- 305 W. Broadway Ave · Broadway Baptist ChurchMar 21, 2024Broadway baptist church chiller relocation — renovation/alteration — relocation of chiller plant from on-grade to rooftop location. new chillers, and new chilled water piping through an existing building. new electrical service and transformer on grade in an existing parking lot · 133 m away
- 207 W. Broadway Ave · Trinity Presbyterian Church Fort WorthJan 25, 2024Trinity presbyterian church — additions to existing building — new three story entrance tower to an existing church · 134 m away
- 306 W Broadway Ave · 306 Partners LLCAug 31, 2026A renovation for mforce capital — renovation/alteration — a 5,500 square-foot tenant improvement project in an existing suite for mforce capital · 146 m away
- 465 S. Main Street- 1st · Chc DevelopmentNov 5, 2024Recluse bookstore — renovation/alteration — interior finish out of new retail space including new restroom and breakroom · 188 m away
- 465 South Main Street · Chc DevelopmentApr 10, 2024City cave float and wellness center — renovation/alteration — tenant improvements for a wellness center in an existing lease space · 188 m away
- 465 S. Main Street · 451 South Main LLCJul 5, 2024Format fitness finish out — renovation/alteration — interior finish out of existing cold dark shell to create new fitness studios · 188 m away
- 411 S Main St · 4 Eleven Realty PartnersApr 18, 2024Forte ovest — renovation/alteration — interior paint, relocation of wall, addition of walking cooler, addition of kitchen. no changes to existent access, nor restrooms · 202 m away
- 524 S. Jennings Street · South Zacks Investment LLCJun 13, 2025524 south jennings redevelopment — renovation/alteration — restoration of an existing facility · 229 m away
- 309 W Daggett · 307 W Daggett Development LLCAug 13, 2026Mea culpa — renovation/alteration — tenant finish out of existing inline space to become a bar with interior and patio seating · 231 m away
- 309 W. Daggett Ave · 307 W Daggett Development LLCDec 11, 2025309 w daggett ave mixed use — renovation/alteration — interior remodel of a first-generation restaurant tenant in a new construction shell, 1,299sqft · 231 m away