4100 International Plaza
Fort Worth, TX 76109 · Rwb Engineering, Overton Tower 2 - Lobby Remodel
Lobby remodel and suite finish-out at Overton Tower II
TDLR records show a first-floor lobby, corridor, auditorium and tenant lounge remodel at multi-tenant Overton Tower II, registered October 24, 2024. A separate interior finish-out for RWB Engineering was registered May 30, 2025; its scope includes HVAC, electrical and plumbing work.
Summarized from Texas Department of Licensing and Regulation records · updated May 30, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 30, 2025
- since Oct 24, 2024
- Largest scope
- 14,220 sf
- Estimated cost
- $650K
- state registration
Where this project stands
Inspected · closing outRWB Engineering
3,678 sq ft · $130K est.
- RegisteredMay 30, 2025
- Plan review
- ConstructionJun '25 – Aug '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsThe scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, plumbing. — overton tower ii
TDLR project registrationRenovation/AlterationInspection Complete3,678 sq ft$130K est.- Project #
- TABS2025020108
- Tenant / owner
- Rwb Engineering
- Design firm
- Pro
- Contact
- Pro
Capital pimrpovement to first floor lobby, corridors, auditorium and tenant lounge — overton center tower 2
TDLR project registrationRenovation/AlterationReview Complete14,220 sq ft$650K est.- Project #
- TABS2025003990
- Tenant / owner
- Overton Tower 2 - Lobby Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4100 International Plaza
What is being built at 4100 International Plaza?
TDLR records show a remodel of the first-floor lobby, corridors, auditorium and tenant lounge, plus a separate interior finish-out for RWB Engineering. The records describe renovation work, not a new building.
When were the projects at Overton Tower II registered?
The lobby remodel was registered October 24, 2024, under TABS2025003990. The RWB Engineering finish-out was registered May 30, 2025, under TABS2025020108.
Is the whole building being remodeled for RWB Engineering?
No. The records describe Overton Tower II as a multi-tenant site. RWB Engineering is listed for a finish-out in an existing single-floor suite; the separate lobby project covers shared building areas.
What work is included in the RWB Engineering finish-out?
The TDLR registration describes a non-structural interior finish-out in an existing single-floor suite, including HVAC, electrical and plumbing work.
How much is the Overton Tower II lobby remodel estimated to cost?
The applicant's TDLR estimate for the lobby remodel is $650,000. This is an estimate for that project, not a confirmed final cost.
Is work planned near Overton Centre II?
Overton Centre II is listed at the same location as the projects at 4100 International Plaza. The records describe work within Overton Tower II, including its lobby and an existing tenant suite.
Also being built nearby
All of 76109- 4100 International Plaza St · Overton Centre IIMar 4, 2025Senior security benefits — renovation/alteration — the scope of this project is a non-structural interior finish-out in an existing single floor suite. scope includes hvac, electrical, and plumbing
- 5001 Briarhaven Rd · Arborlawn United MethodistJan 8, 2026Arborlawn united methodist church playground — renovation/alteration — playground with associated hardscape and fencing · 245 m away
- 4150 International Plaza · Fldr/Tlc Overton Centre, L.p.Aug 11, 2026Creative solutions — renovation/alteration — non-structural interior finish out in an existing single floor suite. includes hvac, electrical, plumbing · 375 m away
More restaurants in 76109.