4501 Barbara Rd
Fort Worth, TX 76114 · City Of Fort Worth
Sidewalk and street improvements planned near AV Cato Elementary
A Safe Routes to School project near AV Cato Elementary includes 39,200 square feet of concrete sidewalk, curb ramps, curb and gutter, and reconstructed residential driveways. The project was registered with the Texas Department of Licensing and Regulation on January 17, 2025. The applicant estimated the project cost at $1,830,830.
Summarized from Texas Department of Licensing and Regulation records · updated Jan 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 17, 2025
- since Jan 17, 2025
- Largest scope
- 39,200 sf
- Estimated cost
- $1.8M
- state registration
Where this project stands
Under constructionAV Cato Elementary Safe Routes to School
39,200 sq ft · $1.8M est.
- RegisteredJan 17, 2025
- Plan review
- ConstructionDec '25 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
1 project39,200sf of concrete sidewalk, 1240 lf of concrete curb and gutter, curb ramp, and reconstructed residential driveways. — n/a
TDLR project registrationNew ConstructionReview Complete39,200 sq ft$1.8M est.- Project #
- TABS2025009797
- Tenant / owner
- Av Cato Elementary Safe Routes To School
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4501 Barbara Rd
What is being built at 4501 Barbara Rd in Fort Worth?
A Safe Routes to School project includes 39,200 square feet of concrete sidewalk, curb ramps, 1,240 linear feet of concrete curb and gutter, and reconstructed residential driveways. It was registered on January 17, 2025.
What is the AV Cato Elementary Safe Routes to School project?
The project involves sidewalk and related street improvements, including curb ramps and reconstructed residential driveways. Its TDLR registration is TABS2025009797.
When was the Safe Routes to School project at 4501 Barbara Rd filed?
The Texas Department of Licensing and Regulation registration is dated January 17, 2025. The record lists the status as Review Complete.
How much sidewalk is planned near AV Cato Elementary?
The project registration describes 39,200 square feet of concrete sidewalk, along with 1,240 linear feet of concrete curb and gutter.
How much will the AV Cato Elementary sidewalk project cost?
The applicant estimated the project cost at $1,830,830 in the TDLR registration. This is an estimate, not a final reported cost.