3700 San Jacinto Dr
Fort Worth, TX 76116 · Dda9 - Existing Delivery Station, Logistiq: San Jacinto Dr (3700) Site Dda9 Permit
Conveyor upgrades at a multi-tenant commercial site
TDLR registrations indicate interior conveyor-system work and two material-handling tipper chutes at the multi-tenant commercial site. The conveyor work was registered on April 11, 2025, and the chute installation was registered on April 16, 2026; the latter registration is marked inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 16, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 16, 2026
- since Apr 11, 2025
- Largest scope
- 114,038 sf
- Estimated cost
- $3.4M
- state registration
Where this project stands
Inspected · closing outDDA9 - Existing Delivery Station
395 sq ft · $118K est.
- RegisteredApr 16, 2026
- Plan review
- ConstructionMay '26 – Nov '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 4 phone numbers
Permit & project history
2 projectsInstallation of two material handling equipment tipper chutes to an existing conveyance system. — dda9 - delivery station
TDLR project registrationRenovation/AlterationInspection Complete395 sq ft$118K est.- Project #
- TABS2026017904
- Tenant / owner
- Dda9 - Existing Delivery Station
- Design firm
- Pro
- Contact
- Pro
No change in use, egress, or occupancy. interior work only. relocate existing conveyors install new conveyors install map's platform and stairs install new compressor system install interior safety fence conveyors = 245'-0" linear feet — amazon dda9
TDLR project registrationRenovation/AlterationProject Registered114,038 sq ft$3.4M est.- Project #
- TABS2025016503
- Tenant / owner
- Logistiq: San Jacinto Dr (3700) Site Dda9 Permit
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3700 San Jacinto Dr
What is being built at 3700 San Jacinto Dr?
TDLR records describe interior conveyor-system alterations and installation of two material-handling tipper chutes at the multi-tenant commercial site. The records do not indicate a change in use, egress, or occupancy.
What work is planned at 3700 San Jacinto Dr in Fort Worth?
A project registered April 11, 2025, covers relocating and installing conveyors, a platform and stairs, a compressor system, and an interior safety fence. A separate registration dated April 16, 2026, covers two tipper chutes.
When was the 3700 San Jacinto Dr project permitted?
TDLR records list the conveyor-system project as registered April 11, 2025, and the tipper-chute project as registered April 16, 2026.
Is the work at 3700 San Jacinto Dr a new building?
The TDLR registrations describe renovations and alterations to an existing commercial site, not new construction. The 2025 registration says the work is interior only and does not change use, egress, or occupancy.
What is being built near Camp Bowie Business Park?
TDLR records indicate conveyor-system alterations and two material-handling tipper chutes at 3700 San Jacinto Dr, about 551 meters from Camp Bowie Business Park. The registrations are dated April 11, 2025, and April 16, 2026.
Is the tipper-chute project at 3700 San Jacinto Dr complete?
The TDLR registration for the two tipper chutes, dated April 16, 2026, is marked inspection complete.
Also being built nearby
All of 76116- 9805 Camp Bowie West BlvdJan 2, 2024Margies italian gardens — renovation/alteration — remodel interior of existing restaurant · 328 m away
- 9944 Camp Bowie West Blvd · Leo-17 Realty LLCOct 19, 2026Camp bowie business park — new construction — single-story pre-engineered metal building with metal/acm panels on exterior and light-gauge metal stud framing, drywall and lay-in ceiling on interior for white box flex space · 551 m away