Trinity Boulevard Phase 2 adds roadway, trails and utilities
A 2,300-foot section of four-lane divided concrete roadway is planned as part of Trinity Boulevard Phase 2 at 8599 Trinity Blvd. The project was registered with TDLR on March 8, 2024, and includes a traffic signal, trails, sidewalks, waterline, storm drain, lighting, landscaping and irrigation.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 8, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 8, 2024
- since Mar 8, 2024
- Largest scope
- 556,240 sf
- Estimated cost
- $556K
- state registration
Where this project stands
Inspected · closing outTrinity Blvd Phase 2
556,240 sq ft · $556K est.
- RegisteredMar 8, 2024
- Plan review
- ConstructionDec '24 – Apr '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectConstruction 2300 lf 4-lane divided concrete roadway. project includes traffic signal, multi-use trails, sidewalks, waterline, storm drain, misc. utility adjustments, street/trail lighting, landscaping & irrigation. — trinity blvd row
TDLR project registrationNew ConstructionInspection Complete556,240 sq ft$556K est.- Project #
- TABS2024013400
- Tenant / owner
- Trinity Blvd Phase 2
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 8599 Trinity Blvd
What is being built at 8599 Trinity Blvd in Fort Worth?
Trinity Boulevard Phase 2 includes 2,300 linear feet of four-lane divided concrete roadway, along with trails, sidewalks and utility work. TDLR records show the project was registered on March 8, 2024.
Is Trinity Boulevard getting a new traffic signal?
Yes. The TDLR project description for Trinity Boulevard Phase 2 includes a traffic signal.
Does the Trinity Boulevard project include walking or biking trails?
The project description includes multi-use trails and sidewalks.
What utilities are part of Trinity Boulevard Phase 2?
The project includes a waterline, storm drain and miscellaneous utility adjustments, as well as street and trail lighting.
Is Trinity Boulevard Phase 2 complete?
The TDLR record lists the project status as “Inspection Complete.” It was registered on March 8, 2024.
What is the estimated cost of Trinity Boulevard Phase 2?
The TDLR registration lists an estimated project cost of $556,240.