4921 South Drive West
Fort Worth, TX 76132 · City Of Fort Worth
New Fort Worth Fire Station #26 planned for South Drive West
A new 10,831-square-foot Fire Station #26 is planned at 4921 South Drive West in Fort Worth, with associated parking, a flag pole, dumpster enclosure and site fence. The Texas Department of Licensing and Regulation project registration was filed November 17, 2024, and lists the status as Review Complete. The applicant’s estimated project cost is $9,613,329.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 17, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 17, 2024
- since Nov 17, 2024
- Largest scope
- 10,831 sf
- Estimated cost
- $9.6M
- state registration
Where this project stands
Finishing up · inspection nextCity of Fort Worth Fire Station #26
10,831 sq ft · $9.6M est.
- RegisteredNov 17, 2024
- Plan review
- ConstructionDec '24 – Apr '26
- Inspectednow
- Closed
Scheduled to finish Apr 1, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectConstruct a new fire station building with associated parking lot, flag pole, dumpster enclosure, and site fence. — fire station #26
TDLR project registrationNew ConstructionReview Complete10,831 sq ft$9.6M est.- Project #
- TABS2025005733
- Tenant / owner
- City Of Fort Worth Fire Station #26
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 4921 South Drive West
What is being built at 4921 South Drive West?
A new City of Fort Worth Fire Station #26 is planned, along with a parking lot, flag pole, dumpster enclosure and site fence. The TDLR registration is project TABS2025005733.
When was the Fire Station #26 project filed?
The TDLR project registration was filed November 17, 2024. It lists the status as Review Complete.
How big will the new Fort Worth fire station be?
The TDLR registration lists the new building at 10,831 square feet.
How much will Fort Worth Fire Station #26 cost?
The applicant’s estimated cost for the project is $9,613,329, according to the TDLR registration. This is an estimate, not a reported final cost.
Is a new fire station planned near Overton Properties on South Hulen Street?
Yes. The planned Fire Station #26 is at 4921 South Drive West, 59 meters from Overton Properties at 5400 S Hulen St, according to the location data.
Who is building the project at 4921 South Drive West?
The project is listed as City of Fort Worth Fire Station #26. The TDLR description calls for a new fire station and associated site features.
Also being built nearby
All of 76132- 5400 S Hulen St · Overton PropertiesAug 24, 202636461 7-eleven rev1 — renovation/alteration — interior remodel with some new equipment, repaired restrooms, some new décor, upgraded building elevation, clean exterior, repair parking lot, enhance landscaping · 59 m away
- 5276 S Hulen Rd · US Bank National AssociationAug 15, 2024Quiggly's clayhouse — renovation/alteration — renovation of a tenant space into a art studio · 171 m away
- 5270 S Hulen St · Venture Hulen, Lp.Mar 17, 2026Superior outfitters - ft. worth — renovation/alteration — remodel of existing lease space · 178 m away
- 5000 South Hulen St., Space · Trademark Property RagerJul 19, 2024Sephora - 5000 south hulen — renovation/alteration — this project is a remodel of an existing tenant fit-out of approximately 4,642 sq ft, work includes new and relocated sales floor fixtures, floor finish replacement and minor electrical work. existing storefront to remain as is · 496 m away