2399 N Main Street
Fort Worth, TX 76164 · City Of Fort Worth
Main Street and 24th Street intersection improvements
Intersection improvements at Main Street (BUS 287) and 24th Street were registered with the Texas Department of Licensing and Regulation on November 5, 2025. The work includes paving and traffic signal improvements, plus 1,150 square feet of pedestrian improvements such as a sidewalk, push button, curb ramp and crosswalk markings. The applicant estimated the project cost at $85,000.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2025
- since Nov 5, 2025
- Largest scope
- 1,150 sf
- Estimated cost
- $85K
- state registration
Where this project stands
Inspected · closing outCPN 103949- Intersection improvements at Main Street (BUS 287) & 24th Street
1,150 sq ft · $85K est.
- RegisteredNov 5, 2025
- Plan review
- ConstructionMar '26 – Jul '26
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectPaving, and traffic signal improvements at intersection. installation of sidewalk, push button, curb ramp, and crosswalk markings. 1150 sq ft of pedestrian improvements. — n/a
TDLR project registrationRenovation/AlterationInspection Complete1,150 sq ft$85K est.- Project #
- TABS2026005152
- Tenant / owner
- Cpn 103949- Intersection Improvements At Main Street (bus 287) & 24th Street
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2399 N Main Street
What is being built at 2399 N Main Street?
The project is intersection work at Main Street (BUS 287) and 24th Street. It includes paving, traffic signal improvements and pedestrian features. The TDLR registration, filed November 5, 2025, lists the project as inspection complete.
What improvements are planned at Main Street and 24th Street?
The registration describes paving and traffic signal improvements, along with a sidewalk, push button, curb ramp and crosswalk markings. It lists 1,150 square feet of pedestrian improvements.
How much will the Main Street and 24th Street improvements cost?
The applicant's estimated cost is $85,000, according to the TDLR registration filed November 5, 2025.
What is changing near Tecovas on North Main Street?
The registered project at Main Street (BUS 287) and 24th Street includes paving, traffic signal work and pedestrian improvements. Tecovas is listed 86 meters from the project address.
Are there sidewalk or crosswalk improvements near Bronc's Tack Room?
The Main Street and 24th Street project includes a sidewalk, curb ramp and crosswalk markings. Bronc's Tack Room is listed 91 meters from the project address.
Also being built nearby
All of 76164- 2405 N Main StDec 30, 2024Boot barn — renovation/alteration — tenant interior alteration to include new walls finishes, fixtures, and paint · 19 m away
- 2341 N Main St · Fw Main Street Partners LLCMar 24, 2026Tecovas - fort worth — renovation/alteration — commercial tenant improvement of a 6778 sq ft stand-alone building including demolition and construction of non-structural partitions, ceilings, finishes and furniture/equipment and associated mep improvements · 86 m away
- 115 W. Exchange Avenue · Stockyards Property Inc.Nov 11, 2025Bronc's tack room — renovation/alteration — interior finish-out of existing restaurant lease space. existing & new mechanical, electrical and plumbing equipment · 91 m away
- 109 East Exchange Avenue · Delightful Boutiques 31, LLCNov 14, 2025Stockyards hotel - front canopy & back patio — renovation/alteration — addition of new front canopy on existing stockyards hotel building and addition of back patio canopy and new outdoor bar and seating area on backside of existing building to replace existing dilapidated decking area · 111 m away
- 2458 Ellis Avenue · Cattle Drive Parking, LLCSep 2, 2026Leddy's garage — new construction — new structured parking · 118 m away
- 2465 North Main St · Rios ShowroomJun 28, 2024Rios interiors facade renovation — renovation/alteration — facade renovation and canopy replacement · 131 m away
- 121 East Exchange Avenue · City Of Fort WorthApr 16, 2024Cowtown coliseum accessiblity modifications phase 2 — renovation/alteration — modifications for an accessible entrance, accessible ramps, and accessible restrooms · 155 m away
- 2315 N. Main Street · Ogc Main Street, LPJan 4, 2024Shs fw hotel canopy — renovation/alteration — roof top bar canopy · 156 m away
- 128 E Exchange Avenue Barn A · Fort Worth Heritage Mb, LLCMar 30, 2026Yellow rose by kendra scott — renovation/alteration — interior tenant fit-out of an existing 6,594 sq ft vacant space in barn a to match the tenant brand standards · 189 m away
- 128 E. Exchange Ave · Fort Worth Heritage Mb, LLCDec 2, 2024Pendleton white box — renovation/alteration — alteration of existing space for potential tenant to occupy - alteration include back of house spaces (i.e. restroom, storage space, service sink, and access to suite space), and fitting room · 189 m away
- 132 E Exchange Ave · Stockyards Station Hotel LPMay 5, 2026Hyatt place stockyards — renovation/alteration — complete interior renovation with exterior upgrades, including addition/modification of patios, addition of shade structures, and landscape work · 190 m away
- 140 E Exchange Avenue · Fort Worth Heritage Sys LLCJun 23, 2026Kilwins — renovation/alteration — interior build-out of existing tenant space for new kilwin's - new interior walls, lighting, finishes, equipment, & furniture · 193 m away