Hill Country Church Phase 2 construction in Fredericksburg

Hill Country Church Phase 2 involves 11,200 square feet of construction at 107 East Lower Crabapple in Fredericksburg, including new wood-stud exterior and interior walls and an elevator shaft within existing concrete block walls. The project was registered with TDLR on March 24, 2025; its estimated project cost is $2 million.

Summarized from Texas Department of Licensing and Regulation records · updated Mar 24, 2025

Projects
1
1 filings
Latest filing
Mar 24, 2025
since Mar 24, 2025
Largest scope
11,200 sf
Estimated cost
$2.0M
state registration

Where this project stands

Under construction

Hill Country Church Phase 2

11,200 sq ft · $2.0M est.

  1. RegisteredMar 24, 2025
  2. Plan review
  3. ConstructionAug '25 – Mar '27
  4. Inspected
  5. Closed
78% through of a 20-month buildAug 4, 2025 → Mar 31, 2027

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. New construction of wood stud exterior and interior walls, elevator shaft within existing cmu block walls. — hill country church

    TDLR project registrationRenovation/AlterationReview Complete11,200 sq ft$2.0M est.
    Tenant / owner
    Hill Country Church Phase 2
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 107 East Lower Crabapple

What is being built at 107 East Lower Crabapple?

A TDLR registration describes Hill Country Church Phase 2, including new wood-stud exterior and interior walls and an elevator shaft within existing concrete block walls. The registration lists 11,200 square feet.

When was the Hill Country Church Phase 2 project filed?

The TDLR project registration was filed March 24, 2025. It is listed as Review Complete under project number TABS2025014936.

How much will the Hill Country Church project cost?

The TDLR registration lists an estimated project cost of $2 million. This is the applicant's estimate for the project.

Is Hill Country Church Phase 2 a new building?

The registration categorizes the project as a renovation or alteration and describes new wall construction and an elevator shaft within existing concrete block walls. It does not specify that the entire building is new.

What is being built near Methodist Church at 1800 N. Llano?

Hill Country Church Phase 2 is registered at 107 East Lower Crabapple, about 467 meters from Methodist Church at 1800 N. Llano. The registration was filed March 24, 2025.

Also being built nearby

All of 78624

More churches & places of worship in 78624.

Email me when it passes inspection