groundranger
Historic · latest filing Sep 2024Commercial

10350 Dallas Parkway

Frisco, TX 75034 · North Texas Tollway Authority

NTTA registered improvements at Main Lane Plaza 4 in Frisco

The North Texas Tollway Authority registered improvements to its 6,398-square-foot Main Lane Plaza 4 building on September 26, 2024. The work includes repairs and replacements to paving, sidewalks, rails, a fire hydrant, an enclosure gate, interior finishes, the front entry door and lighting. The applicant’s estimated project cost is $292,420.

Summarized from Texas Department of Licensing and Regulation records · updated Sep 26, 2024

Projects
1
1 filings
Latest filing
Sep 26, 2024
since Sep 26, 2024
Largest scope
6,398 sf
Estimated cost
$292K
state registration

Where this project stands

Completed

NTTA Main Lane Plaza 4 Building Improvements

6,398 sq ft · $292K est.

  1. RegisteredSep 26, 2024
  2. Plan review
  3. ConstructionJul '24 – Jun '25
  4. Inspected
  5. Closed

Ran as a 11-month build.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Mlp 4 building sq. footage is 6, 398 sq ft scope of work includes repairs for concrete paving and sidewalk, hand and guardrail, bollard, fire hydrant, enclosure gate, interior finishes, front entry door, and lighting replacements. — main lane plaza (mlp) 4

    TDLR project registrationRenovation/AlterationProject Closed6,398 sq ft$292K est.
    Tenant / owner
    Ntta Main Lane Plaza 4 Building Improvements
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 10350 Dallas Parkway

What is being built at 10350 Dallas Parkway in Frisco?

A renovation and improvement project is registered for NTTA Main Lane Plaza 4, a 6,398-square-foot building. The scope includes repairs and replacements to paving, sidewalks, rails, a fire hydrant, an enclosure gate, interior finishes, the front entry door and lighting.

What are the improvements at NTTA Main Lane Plaza 4?

The registered scope includes concrete paving and sidewalk repairs, work on handrails and guardrails, bollards and a fire hydrant, plus an enclosure gate, interior finishes, a front entry door and lighting replacements.

When was the Main Lane Plaza 4 project registered?

The TDLR project registration is dated September 26, 2024.

What is the project number for the NTTA Main Lane Plaza 4 improvements?

The TDLR registration number is TABS2025001904, dated September 26, 2024.

How much will the Main Lane Plaza 4 improvements cost?

The applicant’s estimated cost for the project is $292,420.

Is the Main Lane Plaza 4 project complete?

The TDLR record lists the project status as closed.

Get alerts for 10350 Dallas Parkway