7979 FM 423
Frisco, TX 78503 · Atira LLC
Chick-fil-A drive-thru changes planned at 7979 FM 423
A Chick-fil-A at 7979 FM 423 is registered for changes to its drive-thru, including a continuous dual lane, new curbing, striping and landscaping, plus a dual-lane pickup canopy. The TDLR project registration was filed February 6, 2024, and lists the project as closed. The applicant’s estimated project cost is $410,000.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 6, 2024
- since Feb 6, 2024
- Largest scope
- 4,927 sf
- Estimated cost
- $410K
- state registration
Where this project stands
CompletedCFA #3754 - Frisco Lakes
4,927 sq ft · $410K est.
- RegisteredFeb 6, 2024
- Plan review
- ConstructionJul '24 – Dec '24
- Inspected
- Closed
Ran as a 5-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectModification of the drive-thru configuration to provide a continuous dual-lane from the entrance to the exit of the drive-thru. new curbing, striping, landscaping. adding a dual lane canopy at the drive-thru pick up area — chick-fil-a, inc
TDLR project registrationRenovation/AlterationProject Closed4,927 sq ft$410K est.- Project #
- TABS2024010912
- Tenant / owner
- Cfa #3754 - Frisco Lakes
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7979 FM 423
What is being built at 7979 FM 423 in Frisco?
The TDLR registration describes alterations to the Chick-fil-A drive-thru, including a continuous dual lane and a dual-lane canopy at the pickup area. It does not describe a new restaurant.
When was the Chick-fil-A drive-thru project permitted?
The TDLR project registration, TABS2024010912, was filed February 6, 2024. It lists the project as closed.
What changes are planned for the drive-thru at 7979 FM 423?
The registration describes a continuous dual-lane configuration from the entrance to the exit, along with new curbing, striping and landscaping. It also includes a dual-lane canopy at the pickup area.
How much will the 7979 FM 423 project cost?
The applicant’s estimated cost for the project is $410,000. This is an estimate, not a final reported construction cost.
Is the Chick-fil-A near Bodybar Frisco Lakes being remodeled?
A TDLR registration describes drive-thru alterations at 7979 FM 423, about 105 meters from Bodybar Frisco Lakes at 252 Stonebrook Parkway. The registration was filed February 6, 2024, and is listed as closed.
How large is the Chick-fil-A project at 7979 FM 423?
The TDLR registration lists a project area of 4,927 square feet for the drive-thru alterations.
Also being built nearby
All of 78503- 7979 FM 423 · Atira, LLCApr 2, 2026Chick-fil-a #3754 - frisco, tx — renovation/alteration — new team member access door, tormax drive-thru door, new split system hvac and electric heater and new air curtain
- 252 Stonebrook Parkway · Bodybar Frisco LakesMar 11, 2026Bodybar frisco lakes — renovation/alteration — tenant finish out of an existing space in a shell retail building consisting of a studio area, restrooms and storage/utility room · 105 m away
- 252 W Stonebrook Pkwy · Vista Property CompanyMar 18, 2024The little gym - frisco — renovation/alteration — interior renovation · 137 m away
- 355 Stonebrook Parkway · Walmart Real Estate Business TrustSep 18, 2025Walmart special project — renovation/alteration — installation of tortilla maker and warmer in grocery/deli area. installation of ice maker and water dispenser in associate breakroom · 170 m away
- 355 Stonebrook Pkwy · Wal-Mart Real Estate Business TrustSep 1, 2026#02463.1002 frisco, tx — renovation/alteration — interior and exterior remodel existing sq ft: 186,020 remodeled sq ft: 22,500 · 170 m away
- 400 Stonebrook Pkwy · Ashray Realty LLCAug 26, 2024The offices at stonebrook crossing suite 1104 — new construction — interior finish out of shell space · 246 m away
- 8425 FM 423 · Kims Global Holding LLCJan 2, 2024Massageluxe-frisco — renovation/alteration — demolition of existing construction (partially complete) new massageluxe spa build out · 269 m away
- 8555 FM 423 · Apollo B DentalAug 27, 2024Apollo b dental — renovation/alteration — dental office · 532 m away