29710 Jordan Crossing Boulevard
Fulshear, TX 77494 · Fifth Third Bank
Fifth Third Bank proposed for Jordan Crossing Boulevard
A proposed 1,900-square-foot Fifth Third Bank financial institution with two drive-through lanes is planned at 29710 Jordan Crossing Boulevard in Fulshear. The project was registered with the Texas Department of Licensing and Regulation on August 5, 2026. The applicant estimated the project cost at $2.8 million.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 5, 2026
- since Aug 5, 2026
- Largest scope
- 1,900 sf
- Estimated cost
- $2.8M
- state registration
Where this project stands
Approved · construction starts Dec 10, 2026Fifth Third Bank Jordan Ranch
1,900 sq ft · $2.8M est.
- RegisteredAug 5, 2026
- Plan review
- ConstructionDec '26 – Jul '27
- Inspected
- Closed
A 7-month build is scheduled. Bids for subcontractors and suppliers usually close before the start date.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectProposed financial institution with 2 drive thru lanes. — fifth third bank
TDLR project registrationNew ConstructionReview Complete1,900 sq ft$2.8M est.- Project #
- TABS2026027027
- Tenant / owner
- Fifth Third Bank Jordan Ranch
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 29710 Jordan Crossing Boulevard
What is being built at 29710 Jordan Crossing Boulevard?
A proposed Fifth Third Bank financial institution with two drive-through lanes is registered for the site. The TDLR record lists 1,900 square feet.
Is a Fifth Third Bank coming to Jordan Crossing Boulevard in Fulshear?
A TDLR project registration describes a proposed Fifth Third Bank at 29710 Jordan Crossing Boulevard. The registration was filed August 5, 2026.
How large is the proposed Fifth Third Bank in Fulshear?
The TDLR registration lists the proposed financial institution at 1,900 square feet, with two drive-through lanes.
How much will the Fifth Third Bank project cost?
The applicant's estimated cost for the project is $2.8 million, according to its TDLR registration.
When was the Jordan Crossing Boulevard bank project filed?
The project was registered with the Texas Department of Licensing and Regulation on August 5, 2026. Its TDLR record number is TABS2026027027.
Has construction been approved for the Fifth Third Bank in Fulshear?
The TDLR record lists the project status as “Review Complete” and describes it as proposed new construction. It does not establish that construction has started.