301 University Blvd
Galveston, TX 77555 · Utmb Jst L8 L9 Equipment Make Ready, Utmb - Mother Baby Unit Renovations - Level 4 Cd Wing Jsh Tower + 3 more
UTMB John Sealy Tower levels 8 and 9 renovations
A 39,000-square-foot renovation at UTMB’s John Sealy Tower will add equipment and furniture on level 8, and equipment, furniture, and renovations to existing support spaces on level 9. The project was registered with TDLR on August 3, 2026; the applicant estimated its cost at $800,000.
Summarized from Texas Department of Licensing and Regulation records · updated Aug 3, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Aug 3, 2026
- since Apr 10, 2024
- Largest scope
- 39,000 sf
- Estimated cost
- $14M
- state registration
Where this project stands
Under constructionUTMB JST L8 L9 Equipment Make Ready
39,000 sq ft · $800K est.
- RegisteredAug 3, 2026
- Plan review
- ConstructionAug '26 – Feb '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
5 projectsLevel 8 includes equipment and furniture buildouts. level 9 includes equipment, furniture, and renovations to existing support spaces. — utmb john sealy tower
TDLR project registrationRenovation/AlterationReview Complete39,000 sq ft$800K est.- Project #
- TABS2026026733
- Tenant / owner
- Utmb Jst L8 L9 Equipment Make Ready
- Design firm
- Pro
- Contact
- Pro
12,000 sq ft of renovations for a 14-bed inpatient mother baby unit on the 4th floor cd wing of the john sealy hospital tower. includes support spaced for the patients and staff. this renovation is a continuation of the other renovations in the tower. — utmb john sealy hospital tower - level 4
TDLR project registrationRenovation/AlterationProject Closed12,000 sq ft$6.5M est.- Project #
- TABS2024015910
- Tenant / owner
- Utmb - Mother Baby Unit Renovations - Level 4 Cd Wing Jsh Tower
- Design firm
- Pro
- Contact
- Pro
The scope of work includes renovations to the existing level 9 of the jsh tower into an orthopedics office suite for faculty and staff and staff support spaces. the office suite will be located on the cd wing of the john sealy hospital tower. — john sealy hospital tower - utmb
TDLR project registrationRenovation/AlterationProject Closed14,200 sq ft$4.2M est.- Project #
- TABS2023026161
- Tenant / owner
- Utmb - John Sealy Hospital - Ortho Offices Suite Level 9 Renovations
- Design firm
- Pro
- Contact
- Pro
The scope of work includes renovations to the existing level 10 of the jsh tower into an outpatient clinical consultation unit and faculty offices and staff support spaces, split into wings (ab & cd) for a op clinical wing in the cd wing and office — john sealy hospital tower - utmb
TDLR project registrationRenovation/AlterationProject Closed32,500 sq ft$9.4M est.- Project #
- TABS2023024674
- Tenant / owner
- Utmb - John Sealy Hospital - Behavioral Health Unit Level 10 Renovations
- Design firm
- Pro
- Contact
- Pro
The scope of work includes renovations to the existing level 8 of the jsh tower into an inpatient rehab unit which includes pt/ot gym and nursing support spaces, split into two wings (ab & cd) for 22 single patient beds total. in addition — john sealy hospital tower - utmb
TDLR project registrationRenovation/AlterationInspection Complete32,500 sq ft$14M est.- Project #
- TABS2023023028
- Tenant / owner
- Utmb- John Sealy Hospital - Rehab Level 8 Renovations
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 301 University Blvd
What is being built at 301 University Blvd in Galveston?
The project is a renovation at UTMB’s John Sealy Tower, with equipment and furniture buildouts on level 8 and work on level 9 that also includes renovations to existing support spaces. TDLR registration TABS2026026733 was filed August 3, 2026.
Is a new building going up at 301 University Blvd?
No new building is described in the TDLR record. It lists a renovation and alteration of 39,000 square feet at the John Sealy Tower.
What is the project cost at UTMB John Sealy Tower?
The TDLR registration lists an applicant-estimated project cost of $800,000. It was filed August 3, 2026.
What work is planned on levels 8 and 9 of the John Sealy Tower?
Level 8 includes equipment and furniture buildouts. Level 9 includes equipment, furniture, and renovations to existing support spaces.
What is being renovated near the UTMB OT/PT Clinic?
A 39,000-square-foot project at UTMB’s John Sealy Tower includes equipment and furniture buildouts on levels 8 and 9, plus renovations to existing support spaces. The UTMB OT/PT Clinic is listed 185 meters away.
What project is happening near Galveston Fire Station 2?
The UTMB John Sealy Tower project is a renovation for equipment, furniture, and existing support spaces. Galveston Fire Station 2 is listed 284 meters away.
Also being built nearby
All of 77555- 301 University Blvd · Clinical Science BuildingNov 3, 2026Utmb tdcj admin move — renovation/alteration — renovation of two existing spaces within the utmb campus. renovations of approx. 3420 sq ft of former autopsy space on level 5 of the csb to create new office space and renovation of approx. 2,153 sq ft into office space in the old children's building
- 301 University Blvd Level 6 · Utmb HealthMar 12, 2024Admin level 6 renovation — renovation/alteration — interior renovation of workspace in an existing office building
- 301 University Boulevard Level 1 · Utmb HealthApr 1, 2024Utmb linac replacement — renovation/alteration — renovation, equipment replacement, and finish refresh of approximately 950 sq ft of the linear accelerator and control room on level 1 of the mccullough building
- 301 University Blvd, Rb6 · Rb6 - Research Building No. 6Feb 7, 2025Infrastructure and research space upgrades for research building - phase ii - research building no..6 — renovation/alteration — interior renovation
- 513 Market Street · Arlan's Market #5Oct 9, 2024Remodel arlan's market #5 — renovation/alteration — interior remodel new taqueria and bakery area · 118 m away
- 427 Market St · Magnolia Holding CompanyMay 21, 2026Utmb ot/pt clinic — renovation/alteration — an existing strip mall building is being remodeled as a new occupational therapy (ot) and physical therapy (pt) clinic. it will have new mep, new canopies, updates to the exterior facade, and minor work on the parking lot · 185 m away
- 520 Texas Ave · University Of Texas Medical Branch - Galveston, TXAug 18, 2025Utmb - east chiller plant building & utility loop connection — new construction — new surface parking lot including ada stalls and appropriate sidewalk / ada access grading · 245 m away
- 606 University Boulevard · Phi Chi - Zeta ChapterFeb 28, 2025606 university boulevard — renovation/alteration — tpo roof replacement · 252 m away
- 428 Church St · City Of GalvestonOct 8, 2026Galveston fire station 2 — new construction — elevated 6300 structure with training rooms, dispatch, bathrooms, and offices. underneath the building is enclosed by breakaway screen walls and used for storage · 284 m away
- 715 N Holiday Drive · Galveston Yacht MarinaApr 16, 2025Parking garage - storage enclosure — additions to existing building — modification to existing parking area in existing parking garage - ground floor - to provide storage area (10,250 sq ft) · 396 m away
- 809 Harborside Drive · University At Texas Medical BranchJun 10, 2025Utmb tdcj ct replacement — renovation/alteration — replacement of existing ct with a new model. replacement of finishes and relocation of control room to adjacent space · 409 m away
- 819 Harborside Dr · Utmb Health GalvestonAug 19, 2024M11 upgrade and chiller change — renovation/alteration — to upgrade and repair to the existing mri room, control room and equipment room · 414 m away