groundranger
Recent · latest filing Feb 2026Commercial

600 Colonel Drive

Garland, TX 75043 · Garland ISD Ph3 Bp02 Athletics Package - South Garland Hs, Garland ISD Ph1bp02 Fieldhouse And Multi-Program Activity Center + 2 more

South Garland High School athletics improvements registered

A new concession, restroom and ticketing building, field lighting, bleachers, a scoreboard and site improvements are planned at South Garland High School, with adjacent accessible parking. The Texas Department of Licensing and Regulation registration was filed February 12, 2026, and lists the project status as Review Complete.

Summarized from Texas Department of Licensing and Regulation records · updated Feb 12, 2026

Projects
4
4 filings
Latest filing
Feb 12, 2026
since Apr 2, 2024
Largest scope
80,835 sf
Estimated cost
$26M
state registration

Where this project stands

Under construction

Garland ISD PH3 BP02 Athletics Package - South Garland HS

1,200 sq ft · $8.0M est.

  1. RegisteredFeb 12, 2026
  2. Plan review
  3. ConstructionMar '26 – Dec '26
  4. Inspected
  5. Closed
86% through of a 10-month buildMar 1, 2026 → Dec 31, 2026

4 contacts on this project · 3 phone numbers

Permit & project history

4 projects
  1. New concession/ toilet room/ticketing building, field lighting, bleachers, scoreboard, site improvements with adjacent accessible parking. — south garland high school

    TDLR project registrationNew ConstructionReview Complete1,200 sq ft$8.0M est.
    Tenant / owner
    Garland ISD Ph3 Bp02 Athletics Package - South Garland Hs
    Design firm
    Pro
    Contact
    Pro
  2. 80,835 sq ft / fieldhouse with multi-sport locker rooms, coaches’ offices and support spaces with an indoor multi-program activity practice turf facility and site exterior improvements including parking and fire lanes. — south garland high school

    TDLR project registrationNew ConstructionReview Complete80,835 sq ft$26M est.
    Tenant / owner
    Garland ISD Ph1bp02 Fieldhouse And Multi-Program Activity Center
    Design firm
    Pro
    Contact
    Pro
  3. Replace turf at baseball and softball fields at south garland high schools. scope includes replacing existing dugouts, backstops, protective netting at bleacher areas, and provide fabric canopy structures over bleachers. — south garland high school (baseball/ softball field )

    TDLR project registrationRenovation/AlterationInspection Complete1,000 sq ft$4.4M est.
    Tenant / owner
    Garland ISD-Baseball/Softball Field Improvements (south Garland Hs)
    Design firm
    Pro
    Contact
    Pro
  4. O enhance the acoustical properties at the fine arts rooms by framing walls to deck at above ceiling, acoustically seal wall joints and penetrations above ceiling, and replace existing doors with new sound doors. — south garland high school

    TDLR project registrationRenovation/AlterationProject Closed10,000 sq ft$105K est.
    Tenant / owner
    Gisd - South Garland Hs Acoustical Improvements
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 600 Colonel Drive

What is being built at 600 Colonel Drive in Garland?

A project at South Garland High School includes a new concession, restroom and ticketing building, field lighting, bleachers, a scoreboard and site improvements with adjacent accessible parking. The TDLR registration is TABS2026012436.

What is being added at South Garland High School?

The registered athletics package includes a new concession, restroom and ticketing building, field lighting, bleachers, a scoreboard and site improvements with adjacent accessible parking.

When was the South Garland High School project filed?

The TDLR project registration was filed February 12, 2026.

How big is the new building at South Garland High School?

The TDLR registration lists the new building at 1,200 square feet.

How much will the South Garland High School athletics project cost?

The TDLR registration lists an estimated project cost of $8 million. This is the estimate recorded for the project, not a confirmed final cost.

Has the South Garland High School project been approved?

The TDLR registration lists the status as Review Complete. It was filed February 12, 2026.

More offices in 75043, parking structures in 75043.

Email me when it passes inspection