600 Colonel Drive
Garland, TX 75043 · Garland ISD Ph3 Bp02 Athletics Package - South Garland Hs, Garland ISD Ph1bp02 Fieldhouse And Multi-Program Activity Center + 2 more
South Garland High School athletics improvements registered
A new concession, restroom and ticketing building, field lighting, bleachers, a scoreboard and site improvements are planned at South Garland High School, with adjacent accessible parking. The Texas Department of Licensing and Regulation registration was filed February 12, 2026, and lists the project status as Review Complete.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 12, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Feb 12, 2026
- since Apr 2, 2024
- Largest scope
- 80,835 sf
- Estimated cost
- $26M
- state registration
Where this project stands
Under constructionGarland ISD PH3 BP02 Athletics Package - South Garland HS
1,200 sq ft · $8.0M est.
- RegisteredFeb 12, 2026
- Plan review
- ConstructionMar '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
4 projectsNew concession/ toilet room/ticketing building, field lighting, bleachers, scoreboard, site improvements with adjacent accessible parking. — south garland high school
TDLR project registrationNew ConstructionReview Complete1,200 sq ft$8.0M est.- Project #
- TABS2026012436
- Tenant / owner
- Garland ISD Ph3 Bp02 Athletics Package - South Garland Hs
- Design firm
- Pro
- Contact
- Pro
80,835 sq ft / fieldhouse with multi-sport locker rooms, coaches’ offices and support spaces with an indoor multi-program activity practice turf facility and site exterior improvements including parking and fire lanes. — south garland high school
TDLR project registrationNew ConstructionReview Complete80,835 sq ft$26M est.- Project #
- TABS2024025245
- Tenant / owner
- Garland ISD Ph1bp02 Fieldhouse And Multi-Program Activity Center
- Design firm
- Pro
- Contact
- Pro
Replace turf at baseball and softball fields at south garland high schools. scope includes replacing existing dugouts, backstops, protective netting at bleacher areas, and provide fabric canopy structures over bleachers. — south garland high school (baseball/ softball field )
TDLR project registrationRenovation/AlterationInspection Complete1,000 sq ft$4.4M est.- Project #
- TABS2024015192
- Tenant / owner
- Garland ISD-Baseball/Softball Field Improvements (south Garland Hs)
- Design firm
- Pro
- Contact
- Pro
O enhance the acoustical properties at the fine arts rooms by framing walls to deck at above ceiling, acoustically seal wall joints and penetrations above ceiling, and replace existing doors with new sound doors. — south garland high school
TDLR project registrationRenovation/AlterationProject Closed10,000 sq ft$105K est.- Project #
- TABS2024001347
- Tenant / owner
- Gisd - South Garland Hs Acoustical Improvements
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 600 Colonel Drive
What is being built at 600 Colonel Drive in Garland?
A project at South Garland High School includes a new concession, restroom and ticketing building, field lighting, bleachers, a scoreboard and site improvements with adjacent accessible parking. The TDLR registration is TABS2026012436.
What is being added at South Garland High School?
The registered athletics package includes a new concession, restroom and ticketing building, field lighting, bleachers, a scoreboard and site improvements with adjacent accessible parking.
When was the South Garland High School project filed?
The TDLR project registration was filed February 12, 2026.
How big is the new building at South Garland High School?
The TDLR registration lists the new building at 1,200 square feet.
How much will the South Garland High School athletics project cost?
The TDLR registration lists an estimated project cost of $8 million. This is the estimate recorded for the project, not a confirmed final cost.
Has the South Garland High School project been approved?
The TDLR registration lists the status as Review Complete. It was filed February 12, 2026.