1200 Kingsbridge Dr
Garland, TX 75044 · Garland Independent School Distric
Cooper Elementary playground replacement registered in Garland
A playground replacement at GISD Cooper Elementary is planned at 1200 Kingsbridge Dr, including new equipment, surfacing, a shade canopy, drainage improvements, and sidewalk repairs. The 6,200-square-foot project was registered with TDLR on December 3, 2024, under project number TABS2025006760. The applicant's estimated project cost is $475,213.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 3, 2024
- since Dec 3, 2024
- Largest scope
- 6,200 sf
- Estimated cost
- $475K
- state registration
Where this project stands
CompletedGISD Cooper Elementary School Playground Replacement
6,200 sq ft · $475K est.
- RegisteredDec 3, 2024
- Plan review
- ConstructionJun '25 – Dec '25
- Inspected
- Closed
Ran as a 7-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectReplace playground equipment, surface, and include a new shade canopy. civil improvements like drainage and sidewalk repairs 6200 sq ft — gisd cooper elementary school
TDLR project registrationNew ConstructionProject Closed6,200 sq ft$475K est.- Project #
- TABS2025006760
- Tenant / owner
- Gisd Cooper Elementary School Playground Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1200 Kingsbridge Dr
What is being built at 1200 Kingsbridge Dr in Garland?
TDLR records describe a playground replacement at GISD Cooper Elementary, including new playground equipment, surfacing, and a shade canopy, along with drainage and sidewalk repairs. The 6,200-square-foot project was registered December 3, 2024.
What is the project number for the Cooper Elementary playground replacement?
The TDLR project number is TABS2025006760. It was registered on December 3, 2024.
How much will the Cooper Elementary playground project cost?
The applicant's estimated cost for the project is $475,213, according to its TDLR registration.
Is the Cooper Elementary playground project still underway?
The TDLR record lists the project status as closed. It was registered on December 3, 2024.
What's being built near Garland Independent School District in Garland?
At GISD Cooper Elementary, TDLR records describe a playground replacement with new equipment, surfacing, and a shade canopy, plus drainage and sidewalk repairs. The project was registered December 3, 2024.
Also being built nearby
All of 75044- 1200 Kingbridge Dr · Garland Independent School DistrictJan 3, 2025Gisd phase 1 fencing - cooper — renovation/alteration — new fence and pedestrian gates
- 1445 W. Buckingham Road · Buckingham Plaza Ltd PsJan 16, 2025Ross #2778 — renovation/alteration — interior alteration of existing building · 497 m away
- 1400 W. Buckingham Road · Northstar Plaza Sc, Ltd.Jul 22, 2026Pro-care medical center — renovation/alteration — 2,213 sq ft new build-out of existing shell space construction to include: interior walls ,floors finishes, interior doors, millwork and light fixtures · 521 m away
- 1410 W Buckingham Rd · Northstar Plaza Sc, Ltd.Mar 31, 2026Hacienda buffet — renovation/alteration — a 9,500 sq ft interior renovation consisting of buffet lines and interior refresh · 529 m away