Medical and office suite build-outs at Fountains of Georgetown
TDLR registrations show interior finish-outs for two suites in the multi-tenant Fountains of Georgetown Building 5 at 101 Cooperative Way. The office suite was registered on August 14, 2024, and the medical office suite on November 19, 2024; both records list inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Nov 19, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 19, 2024
- since Aug 14, 2024
- Largest scope
- 3,320 sf
- Estimated cost
- $249K
- state registration
Where this project stands
Inspected · closing outFountains of Georgetown Blg. 5 Suite 520
3,320 sq ft · $249K est.
- RegisteredNov 19, 2024
- Plan review
- ConstructionJan '25 – Jun '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsInterior finish out of a medical office suite with break room exam rooms and 2 restrooms — fountains of georgetown building 5
TDLR project registrationAdditions to Existing BuildingInspection Complete3,320 sq ft$249K est.- Project #
- TABS2025005899
- Tenant / owner
- Fountains Of Georgetown Blg. 5 Suite 520
- Design firm
- Pro
- Contact
- Pro
Tenant finish out including two restrooms, break room and open office areas and one conference room. — fountains of georgetown blg. 5 suite 100
TDLR project registrationRenovation/AlterationInspection Complete2,541 sq ft$190K est.- Project #
- TABS2024025433
- Tenant / owner
- Fountains Of Georgetown Blg. 5 Suite 100
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 101 Cooperative Way
What is being built at 101 Cooperative Way in Georgetown?
TDLR records describe interior finish-outs for an office suite and a medical office suite in Fountains of Georgetown Building 5. Both registrations list inspection complete.
What is going in Suite 520 at Fountains of Georgetown?
The November 19, 2024, registration describes a 3,320-square-foot medical office finish-out with exam rooms, a break room and two restrooms. It is listed as inspection complete under project TABS2025005899.
What is going in Suite 100 at Fountains of Georgetown?
A tenant finish-out was registered for Suite 100 on August 14, 2024. The 2,541-square-foot office space includes open office areas, a conference room, a break room and two restrooms; the record lists inspection complete under TABS2024025433.
When were the Fountains of Georgetown Building 5 suites permitted?
The Suite 100 registration is dated August 14, 2024, and the Suite 520 registration is dated November 19, 2024. Both are Texas Department of Licensing and Regulation project registrations.
How much are the Fountains of Georgetown suite projects estimated to cost?
The applicant's estimate is $190,000 for the Suite 100 finish-out and $249,000 for Suite 520, according to their TDLR registrations.
What is being built near Fountains Building 3 in Georgetown?
At 101 Cooperative Way, TDLR records describe office and medical office suite finish-outs in Fountains of Georgetown Building 5. Fountains Building 3 is listed nearby.
Also being built nearby
All of 78627- 101 Cooperative Way · M&m Georgetown InvestmentsMay 30, 2025Medi-weightloss georgetown — renovation/alteration — first time tenant improvement to existing building. new layout, finishes, plumbing fixtures, lighting, hvac equipment & electrical panels/outlets. not site work, utilities, or building exterior modifications
- 101 Coopertive Way · Fountains Building 3Nov 5, 2026Fountains building 3 — additions to existing building — tenant finish out office
- 111 Cooperative Way · Cooperative Way TX LLCFeb 19, 2026Molex finish renovation — renovation/alteration — interior finish renovation · 38 m away
- 3201 S. Austin Ave · South Austin Ave Professional Build LLCAug 3, 2024Aon suite expansion — renovation/alteration — adding adjacent suite to existing suite and modifying for their use · 179 m away
- 101 SE Inner Loop DrJul 17, 2025Schunk xycarb building addition — additions to existing building — addition of utility and support spaces to single story exisiting manufacturing facility · 469 m away