groundranger
Historic · latest filing May 2024Commercial

850 Buffalo St

Gilmer, TX 75644 · Gilmer ISD

A credit union smart branch is planned inside Gilmer High School

A 769-square-foot fit-out for a proposed CUTX credit union smart branch inside Gilmer High School was registered with TDLR on May 21, 2024. The work is in an existing single-level space. The applicant's estimated project cost is $200,000.

Summarized from Texas Department of Licensing and Regulation records · updated May 21, 2024

Projects
1
1 filings
Latest filing
May 21, 2024
since May 21, 2024
Largest scope
769 sf
Estimated cost
$200K
state registration

Where this project stands

Completed

CUTX Gilmer High School Smart Branch

769 sq ft · $200K est.

  1. RegisteredMay 21, 2024
  2. Plan review
  3. ConstructionJun '24 – Aug '24
  4. Inspected
  5. Closed

Ran as a 2-month build.

4 contacts on this project · 4 phone numbers

Permit & project history

1 project
  1. Tenant fit out of an existing single level 769 sq ft space within the gilmer high school to include a proposed credit union smart branch. — gilmer high school

    TDLR project registrationRenovation/AlterationProject Closed769 sq ft$200K est.
    Tenant / owner
    Cutx Gilmer High School Smart Branch
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 850 Buffalo St

What is being built at 850 Buffalo St in Gilmer?

A proposed CUTX credit union smart branch is planned in an existing space inside Gilmer High School. The TDLR registration describes a 769-square-foot fit-out.

Is CUTX opening a branch at Gilmer High School?

A TDLR project registration describes a proposed CUTX smart branch in the school. The record does not confirm whether or when it opened.

When was the Gilmer High School smart branch project filed?

The TDLR registration was filed on May 21, 2024. Its project number is TABS2024019047.

How much will the CUTX smart branch project cost?

The applicant estimated the project cost at $200,000. The registration covers a 769-square-foot fit-out of an existing space.

Is the CUTX project new construction or a renovation?

The TDLR record classifies it as a renovation or alteration. The work is described as a fit-out of an existing single-level space at Gilmer High School.

What is the status of the Gilmer High School smart branch project?

The TDLR record lists the project status as “Project Closed.” It does not say whether the branch opened.

More schools & daycares in 75644.

Get alerts for 850 Buffalo St