groundranger
Recent · latest filing Dec 2025Commercial

203 Gateway

Granbury, TX 76049 · Atwoods Granbury

Atwoods Granbury project includes a 54,840-square-foot building

A 54,840-square-foot, one-story building named Atwoods Granbury was registered as a new-construction project with the Texas Department of Licensing and Regulation on Dec. 17, 2025. The applicant estimated the project cost at $4.3 million; the registration lists its status as Review Complete.

Summarized from Texas Department of Licensing and Regulation records · updated Dec 17, 2025

Projects
1
1 filings
Latest filing
Dec 17, 2025
since Dec 17, 2025
Largest scope
54,840 sf
Estimated cost
$4.3M
state registration

Where this project stands

Under construction

Atwoods Granbury

54,840 sq ft · $4.3M est.

  1. RegisteredDec 17, 2025
  2. Plan review
  3. ConstructionJan '26 – Feb '28
  4. Inspected
  5. Closed
42% through of a 25-month buildJan 2, 2026 → Feb 2, 2028

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. Atwoods Granbury

    54,840 s.f. one story slab-on-grade, steel frame, insulated exterior panels, single ply roof, hvac units on the roof. — atwoods granbury

    TDLR project registrationNew ConstructionReview Complete54,840 sq ft$4.3M est.
    Tenant / owner
    Atwoods Granbury
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 203 Gateway

What is being built at 203 Gateway in Granbury?

A TDLR registration describes a 54,840-square-foot, one-story new-construction project named Atwoods Granbury. It was registered on Dec. 17, 2025.

Is a new Atwoods building planned at 203 Gateway?

The TDLR project is named Atwoods Granbury and is listed as new construction. The registration describes a 54,840-square-foot, one-story building.

How large is the Atwoods Granbury project?

The TDLR registration lists the building at 54,840 square feet.

What is the estimated cost of the Atwoods Granbury project?

The applicant's TDLR estimate is $4.3 million. This is an estimate for the project, not a reported final cost.

When was the Atwoods Granbury project registered?

The TDLR registration was filed on Dec. 17, 2025, and lists the status as Review Complete.

What construction details are listed for 203 Gateway?

The registration describes a slab-on-grade foundation, steel frame, insulated exterior panels, a single-ply roof, and rooftop HVAC units.

Email me when it passes inspection