1200 Block Of Lipscomb St. & Forest St

Grapevine, TX 76051 · City Of Grapevine

Forest and Lipscomb street and utility improvements

The City of Grapevine registered a project for road and utility improvements at Forest Street and Lipscomb Street on April 16, 2025. The scope includes 800 feet of asphalt roadway with curb, gutter and sidewalk, plus storm drain, water line and sewer line improvements and replacements; the TDLR registration lists an estimated cost of $1.5 million.

Summarized from Texas Department of Licensing and Regulation records · updated Apr 16, 2025

Projects
1
1 filings
Latest filing
Apr 16, 2025
since Apr 16, 2025
Largest scope
4,000 sf
Estimated cost
$1.5M
state registration

Where this project stands

Inspected · closing out

Paving and Utility Improvement for Forest St. & Lipscomb St.

4,000 sq ft · $1.5M est.

  1. RegisteredApr 16, 2025
  2. Plan review
  3. ConstructionJun '25 – Mar '26
  4. Inspected
  5. Closednow

The building is substantially done. Move-in, fit-out and service work usually follow.

4 contacts on this project · 3 phone numbers

Permit & project history

1 project
  1. 800 lf asphalt roadway with curb and gutter and sidewalk. internal storm drain, water line, and sewer line improvements and replacements. (sq ft;4000) — n/a

    TDLR project registrationNew ConstructionInspection Complete4,000 sq ft$1.5M est.
    Tenant / owner
    Paving And Utility Improvement For Forest St. & Lipscomb St.
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1200 Block Of Lipscomb St. & Forest St

What is being built at Forest Street and Lipscomb Street in Grapevine?

A City of Grapevine project covers roadway and utility improvements, including 800 feet of asphalt road, curb, gutter and sidewalk, along with storm drain, water and sewer work. The TDLR project registration was filed April 16, 2025.

What is the project at the 1200 block of Lipscomb Street and Forest Street?

The project is for paving and utility improvements. Its scope includes roadway work and improvements or replacements to storm drain, water and sewer lines.

What's being built near the City of Grapevine on Shady Brook Drive?

The Forest Street and Lipscomb Street project is about 441 meters from the City of Grapevine location at 602 Shady Brook Drive. It covers roadway and utility improvements.

What is the estimated cost of the Forest and Lipscomb street project?

The TDLR registration lists an estimated project cost of $1.5 million. This is the applicant's estimate for the project.

When was the Forest Street and Lipscomb Street project filed?

The TDLR project registration, number TABS2025016757, was filed April 16, 2025.

Is the Forest and Lipscomb street project complete?

The TDLR record lists the status as “Inspection Complete.”