2500 Fairway Drive
Grapevine, TX 76051 · 100 Dock Slip Replacement, L Dock Replacement @ Slm + 4 more
Dock additions and replacements registered at Silver Lake Marina
TDLR registrations show dock additions and replacements at the multi-tenant marina site at 2500 Fairway Drive. The registrations were filed from July 3 through December 9, 2024, and cover several docks, including new slips and replacement slips.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 9, 2024
- Projects
- 6
- 6 filings
- Latest filing
- Dec 9, 2024
- since Jul 3, 2024
- Largest scope
- 11,424 sf
- Estimated cost
- $567K
- state registration
Where this project stands
Completed100 Dock Slip Replacement
5,040 sq ft · $216K est.
- RegisteredDec 9, 2024
- Plan review
- ConstructionJan '25 – May '25
- Inspected
- Closed
Ran as a 4-month build.
4 contacts on this project · 3 phone numbers
Permit & project history
6 projectsReplacing (5) covered slips 18x50 and (2) uncovered slips 12x28 — silver lake marina
TDLR project registrationNew ConstructionProject Closed5,040 sq ft$216K est.- Project #
- TABS2025007162
- Tenant / owner
- 100 Dock Slip Replacement
- Design firm
- Pro
- Contact
- Pro
Adding (34) slips 12x28 — silver lake marina
TDLR project registrationNew ConstructionProject Closed11,424 sq ft$567K est.- Project #
- TABS2024023252
- Tenant / owner
- L Dock Replacement @ Slm
- Design firm
- Pro
- Contact
- Pro
Adding (34) slips 12x28 — silver lake marina
TDLR project registrationNew ConstructionProject Closed11,424 sq ft$567K est.- Project #
- TABS2024023255
- Tenant / owner
- K Dock Replacement @ Slm
- Design firm
- Pro
- Contact
- Pro
Adding (30) slips 12x28 — silver lake marina
TDLR project registrationNew ConstructionProject Closed10,080 sq ft$500K est.- Project #
- TABS2024023260
- Tenant / owner
- O Dock Replacement @ Slm
- Design firm
- Pro
- Contact
- Pro
Adding (20) slips 12x28 — silver lake marina
TDLR project registrationNew ConstructionProject Closed6,720 sq ft$334K est.- Project #
- TABS2024023257
- Tenant / owner
- P Dock Replacement @ Slm
- Design firm
- Pro
- Contact
- Pro
Install (18) 12' x 34' covered slips with a 6' wide head pier — silver lake marina
TDLR project registrationNew ConstructionProject Closed9,990 sq ft$399K est.- Project #
- TABS2024022362
- Tenant / owner
- J Dock Replacement
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2500 Fairway Drive
What is being built at 2500 Fairway Drive in Grapevine?
TDLR registrations describe dock additions and replacements at the marina site, including new boat slips. The filings identify the marina as Silver Lake Marina.
Is Silver Lake Marina adding boat slips?
Yes. Registrations filed in July 2024 describe adding slips at the J, K, L, O and P docks.
How many new slips are listed in the dock registrations?
The five addition registrations list 136 slips in total: 18 at J Dock, 34 each at K and L docks, 30 at O Dock and 20 at P Dock.
What is being replaced at Silver Lake Marina?
A December 9, 2024, registration describes replacing five covered slips measuring 18 by 50 feet and two uncovered slips measuring 12 by 28 feet.
When were the marina dock projects registered?
The earliest listed registration was filed July 3, 2024, for J Dock. The latest was filed December 9, 2024, for the 100 Dock Slip Replacement project.
Are the dock projects at 2500 Fairway Drive complete?
The TDLR records list the registrations as “Project Closed.” That status is what the records report; it does not independently confirm the construction completion date.