Two dock-slip additions registered at Grapevine marina site
TDLR records document two dock-slip additions at the multi-tenant site at 2500 Oak Grove Loop. The latest, for eight covered slips, was registered on February 20, 2024; an earlier 10-slip addition was registered on December 14, 2023. Both records are marked project closed.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 20, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Feb 20, 2024
- since Feb 20, 2024
- Largest scope
- 5,440 sf
- Estimated cost
- $240K
- state registration
Permit & project history
2 projectsAdd 8 new covered slips at 600/700 dock ( 8 - 14' x 34' slips) — scott's landing marina
TDLR project registrationAdditions to Existing BuildingProject Closed5,440 sq ft$175K est.- Project #
- TABS2024011946
- Tenant / owner
- Scott's Landing Marina - 600/700 Dock Slip Addition (8 - 14' X 34' Slips)
- Design firm
- Pro
- Contact
- Pro
Add 10 new slips at 400/500 dock (5 slips @ 12' x 28' & 5 slips @ 12' x 32'). roof area over slips = 5,346 sq ft floating structure = 1,746 sq ft — scot's landing marina
TDLR project registrationAdditions to Existing BuildingProject Closed5,346 sq ft$240K est.- Project #
- TABS2024007408
- Tenant / owner
- 400/500 Dock 10 Slip Addition (5 - 12' X 28" & 5 - 12' X 32')
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2500 Oak Grove Loop
What is being built at 2500 Oak Grove Loop in Grapevine?
TDLR records list additions of 18 boat slips across two dock projects at the multi-tenant marina site. The latest project adds eight covered slips.
How many new boat slips are in the dock additions?
The two registrations describe 18 new slips: 10 at the 400/500 dock and eight covered slips at the 600/700 dock.
When was the latest dock project registered?
The eight-slip addition was registered with TDLR on February 20, 2024, under project number TABS2024011946.
When was the 10-slip dock addition registered?
The 10-slip addition was registered on December 14, 2023, under TDLR project number TABS2024007408.
Are the new boat slips covered?
The February 2024 registration describes eight covered slips at the 600/700 dock. The December 2023 registration describes 10 slips at the 400/500 dock.
Are the dock additions finished?
Both TDLR records are marked project closed. That status does not by itself confirm when construction was completed.